Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Mar 15, 2022

52-22 Agreement for Environmental Services Remedial Investigation Activities and Reporting.pdf

Preserved file SHA-256179af86bb0a7e95f71e733a2a3affc27c952cb920fd312ec93e2e0fb03c4fad0

Indexed text · page 7

Show all pages
Page 7

MATRIXNEWORLD Engineering Progress Task 3: Remedial Investigation Report Preparation and Submission Labor -$ 20,960.00 Direct Expenses. S$ 1,000.00 Total for Task 3. 21,960.00 Task 4: Preliminary Engineering and Project Documents Revi Labor... -$___10.000.00 Total for Task 4, isa dhaee q 10,000.00 $ 9,770.00 Direct Expenses (EDR, File Revi $ 2,450.00 Total for Task 5. .$ 12,220.00 we -$ 20,840.00 Direct Expenses (Soil Investigation, Groundwater Investigation, GPR) . -$___64.120.00 Total for Task 6 -$ 84,960.00 Task 7: Site Investigation Report for 25 Lakeside Avenue — DPW Labor -$ 16,880.00 Direct Expense: 5 680.00 Total for Task 7. -$ 17,560.00 Total Estimated Costs $ 388,690.00 ASSUMPTIONS AND EXCLUSIONS This proposal is based on the following assumptions e Access will be provided to on-site sample locations; ¢ All field work will be completed in Level D personal protective equipment; ¢ All samples will be analyzed on a standard turnaround time basis, unless otherwise noted; ¢ All investigation derived waste will be disposed of as non-hazardous waste; ¢ No additional assessment or investigation activities or LSRP documents beyond the activities identified in the scope of work are included; All work will be completed during normal business hours; Costs exclude any NJDEP inspections; Costs do not include any additional NJDEP notification or reporting fees; Costs do not include the limited Phase || Environmental Site Assessment investigations; Costs do not include any waste classification soil sampling or disposal of the stockpiled soils; and * All external costs will be charged at cost plus 15%. Separate authorization from the client will be requested prior to commencing services outside the scope of this proposal. All out-of-pocket expenses including, but not limited to, application fees, laboratory testing costs, mylar copies, certified mailings, photographs, blueprints, and special deliveries are considered additional to the proposal items unless specifically noted within the scope of this proposal. This proposal is submitted solely and exclusively for the use of Township of West Orange for consideration of the professional services of Matrix. Disclosure of this proposals content to any FA2021121-1041 - Township of West Orange Phase | ESAs Downtown Corridor\Proposal\Remedial Investigation - 55 Lakeside\RI Proposal_55 Lakeside Avenue-FINAL_REV.docx

Page 7

re of this proposals content to any FA2021121-1041 - Township of West Orange Phase | ESAs Downtown Corridor\Proposal\Remedial Investigation - 55 Lakeside\RI Proposal_55 Lakeside Avenue-FINAL_REV.docx 7

File revisions (1)