Supporting Documentation · Apr 5, 2022
70-22 RFP and Response CME Associates - 10 Rooney Circle Pickleball Courts.pdf
4065f19428ec04c528daac7e1b1aef94bfb1ca590dab12455a53532cdd809215Indexed text · page 1
Show all pagesTOWNSHIP OF WEST ORANGE 25 Lakeside Avenue, West Orange, New Jersey 07052 DEPARTMENT OF PUBLIC WORKS Engineering Division ROBERT PARISI MAYOR LEONARD R. LEPORE Tel: (973) 325-4160 Municipal Engineer Fax: (973) 669-9588 Director of Public Works Email: Engineering@westorange.org February 17,2022 Trevor Taylor CME 379 US Route 1 South, Suite 100 Monmouth Junction, NJ, 08852 RE: REQUEST FOR PROPOSALS 10 ROONEY CIRCLE COURTS Dear Mr. Taylor, The Engineering Division of the Department of Public Works for the Township of West Orange requests proposals from firms providing both Civil and Engineering and Land Surveying Services, which are capable of preparing the necessary improvement plans, specifications and bid documents for the following recreational improvements: 1. Land Surveying Services: A. Topographic Survey within project limits; B. Establish horizontal contro] will be based on North American Datum 1983 (New Jersey State Plane Coordinate System-NAD 83) and North American Vertical Datum 1988 (NAVD 88); C. Benchmark(s) to be set on site for future use; D. Existing conditions/Survey Control plan; E. Coordinate utility mark-outs; 2. Civil Engineering Services: A. Develop color renderings; B. Design considerations for parking layout and reconfiguration; C, Drainage improvements as necessary; D. Pickleball courts layout, perimeter fencing, surface striping and netting; AN EQUAL OPPORTUNITY EMPLOYER www.wesiorange.org
File revisions (1)
- Sep 29, 2026
4065f19428ec2,768,258 bytes