Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Apr 5, 2022

70-22 RFP and Response CME Associates - 10 Rooney Circle Pickleball Courts.pdf

Preserved file SHA-2564065f19428ec04c528daac7e1b1aef94bfb1ca590dab12455a53532cdd809215

Indexed text · page 6

Show all pages
Page 6

ASSOCIATES Leonard R. Lepore, Municipal Engineer March 11, 2022 Township of West Orange Proposal No.2022-081 Re: Pickleball Courts Improvements at 10 Rooney Drive Page 2 2. . Construction Plans and Contract Documents The work in this phase will involve preparing construction plans for the resurfacing of Pickleball Courts Improvements in accordance with the RFP requirements. Work in this phase will involve but not be limited to the following: A. Develop color renderings; Design considerations for parking layout and reconfiguration; . Drainage improvements as necessary; . Pickleball courts layout, perimeter fencing, surface striping and netting; Design considerations for post-tension concrete courts; mmo0o Plan Set to include but not limited to Cover Sheet, Existing Conditions/Survey Control Plan, Demolition Plan, Construction Plan, Grading and Utility Plan, Soil Erosion and Sediment Control Plan and Details, and Construction Details; G. Prepare Lighting Layout Plan with LED throughout and construction details; and, H. Permitting coordination for all proposed site improvements. Summary of Fee Estimates 1. Survey and Base Map Services.........ccssscccsecessceesesesessssnscscseseeeseeeseensssseeeseenenaeaeetees $5,500.00 2. Construction Plans and Bid Document................:scscsssssssssessssssessssscessscssensaseseees $11,000.00 ‘Total Lui Sin F 6G sesesescesesscasesacesscsssccccesesenestcasseactnoneeensoseenencenneneeneneneneneeeneerseqeseqvevensisnonsan $16,500.00 The above fee estimates are based on information provided to us by the Township. Should the scope of the project change requiring additional professional fees, we will detail same in writing and seek authorization prior to proceeding. Schedule We anticipate that the project will take approximately two (2) weeks for the survey and base map services and four (4) weeks for the design phase services for a total project schedule of six (6) weeks. ‘SWest Orange\Proposals\22-03-14 Pickleball Courts - 10 Rooney Circle Design. docx

File revisions (1)