Supporting Documentation · Apr 5, 2022
99-22 Attachment.pdf
4868ee0148c69968e60d587609f6eb16562765215393fb90929f19d687df9472Indexed text
OIRECTED) 1 unit | s | 2,607.00 | $ 2tf00 $ | 3,500.00 | § 3p oo] 5,000.00] 5,000.00] $ 5,280.00] $ 5,280.00] $ 16,000.00] s 15,000.00] $ 3,500.00/$ 3,500.00 TOPSOIL SPREADING, TYPE A 7 31 {PND WHERE DIRECTED) 10000 sy | 2.98 | § 22,s0dp0 sf 3.00]8 30,0000] 400|$ 40,000.00} 5.20| § 52,000.00 | $ 5.00 | § 50,000.00 | $ 3.00 | 50,000.00 FERTILIZING AND SEEDING, TYPE A 32 REND WHeeE DIRECTED) 10000 sy | 1.07] 3 ro.004p | 200|$ 20,0000] s 200|s 20,000.00] § 0.8 | § 9,800.00 | $ 5.00 | § 50,000.00 | $ 2.00 | $ 20,000.00 33 STRAW MULCHING (IF AND WHERE DIRECTED) 10000 sy } 1.07|$ 10,700.01 I 1.00] s 10,00. s 1.00] 10,000.00} $ 0.50 | § 3,000.00 | $ 5.00 | $ 50,000.00 | $ 2.00 | $ 20,000.00 34 CONTRACT ALLOWANCE i Ls. [is __25,00000| § 25,000.00 25,000.00] $ 25,000.04 | $ _25,000.00|$ _-25,000.00| $__ 25,000.00 $ 25,000.00 | $ 25,000.00 | $ 26,000.00 | $ 25,000.00 | § 25,000.00 TOTAL BASE BID AMOUNT $426,118.81 $633,029.00 $_1,110,725.00 $__ 1,264,619.60 $_1,298,450.00 $__1,556,300.00
ROCK SPRING GOLF CLUB CART PATH IMPROVEMENTS BIDS RECEIVED ON: APRIL 5, 2022 ENGINEER'S TABULATION OF ALTERNATE BIDS 7 8 g Dal Paving Contractors, Inc. Pav-Con Construction, Inc. Flanagan's Contracting Group, Inc. Contractor Name. Contractor Name. Contractor Name 675 Franklin Avenue, 585 Forest Street 90 Old Camplain Road Street Address Street Address Street Address Nutle) NJO7110 Orange NJ.07050 Hillsborough Nu 08844 City State/Zip City StatelZip city State/Zip Item # Description Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount 1 MOBILIZATION 1 is 325,000.00 | 25,000.00 | $ 25,000.00 | $ 25,000.00 | $150,000.00 | $ 150,000.00 2 FUEL PRICE ADJUSTMENT. 1 DOLLAR | $ 17,000.00 | $ 17,000.00] $ 17,000.00 | $ 17,000.00] $17,000.00 | $ 17,000.00 3 ‘ASPHALT PRICE ADJUSTMENT. 4 DOLLAR | $ __ 10,000.00 | $ 70,000.00 $ 10,000.00 | $ 10,000.00 $ 10,000.00 | $ 10,000.00 4 CLEARING SITE 1 us $150,000.00 | $ 750,000.00] $65,000.00 | $ 65,000.00] $ 78,809.00 | $ 78,809.00 EXCAVATION, UNCLASSIFIED 5 (iF AND WHERE DIRECTED) 400 cy |$ 45.00 | § 18,000.00 | $ 25.00 | $ 10,000.00 | $ 30.00] $ 12,000.00 EXCAVATION, TEST PITS 6 (UF AND WHERE DIRECTED) 30 cy |s 500.00 | $ 15,000.00 | $ 100.00 | $ 3,000.00 | $ 10.00 | $ 300.00 DENSE GRADED AGGREGATE BASE COURSE, 4" THICK (IF AND 7 WHERE DIRECTED) 50 cy |s 150.00 | $ 7,500.00 | $ 50.00 | $ 2,500.00 | $ 67.00] $ 3,350.00 8 1-14 SOIL AGGREGATE 525 cy |$ 150.00 | $ 78,750.00 | $ 40.00 | $ 21,000.00 | $ 67.00 | $ 35,175.00 HMA I-5 SURFACE COURSE, 2" THICK 9 (F AND WHERE DIRECTED) 300 TON | $ 150.00 | $ 45,000.00 | $ 125.00 | $ 37,500.00 | $ 150.00 | $ 45,000.00 40 " DIA. DUCTILE IRON PIPE (IF AND WHERE DIRECTED) 50 LF $ 500.00 | $ 25,000.00 | $ 125.00 | $ 6,250.00 | $ 87.00 | $ 4,350.00 1 6" DIA. HDPE PIPE (IF AND WHERE DIRECTED) 50 LF $ 80.00 | $ 4,000.00 | $ 50.00 | $ 2,500.00 | $ 45.00 | $ 2,250.00 12 8" DIA. HDPE PIPE (IF AND WHERE DIRECTED) 50 LF $ 700.00 | $ 5,000.00 | $ 50.00 | $ 2,500.00 | $ 46.00 | § 2,300.00 13 42" DIA. HDPE PIPE (IF AND WHERE DIRECTED) 50 LF $ 700.00 | $. 5,000.00 | $ 75.00 [ $ 3,750.00 | $ 48.00 | $ 2,400.00 4 15" DIA. HDPE PIPE (IF AND WHERE DIRECTED) 50 LF $ 125.00 | $ 6,250.00 | $ 100.00 | $ 5,000.00 | $ 51.00 | $ 2,550.00 15 LAWN INLET, 2°X2" 12 unit [$s 7,200.00/$ 14,400.00 | $ 7,000.00 | $ 72,000.00] $ _2,000.00| $ 24,000.00 6" DIA. HDPE FLARED END SECTION 16 (F AND WHERE
$ 100.00 | $ 5,000.00 | $ 51.00 | $ 2,550.00 15 LAWN INLET, 2°X2" 12 unit [$s 7,200.00/$ 14,400.00 | $ 7,000.00 | $ 72,000.00] $ _2,000.00| $ 24,000.00 6" DIA. HDPE FLARED END SECTION 16 (F AND WHERE DIRECTED) 2 uniT | $ 500.00 | $ 1,000.00 | $ 250.00 | $ 500.00 | $ 500.00 | $ 1,000.00 8" DIA. HDPE FLARED END SECTION 7 (F AND WHERE DIRECTED) 2 unit | $ 600.00 | $ 1,200.00 | $ 250.00 | $ 500.00 | $ 500.00 | $ 1,000.00 12" DIA. HDPE FLARED END SECTION 18 UF AND WHERE DIRECTED} 2 unit | $ 750.00 | $ 1,500.00 | $ 500.00 | $ 1,000.00 | $ 500.00 | $ 1,000.00 15" DIA. HDPE FLARED END SECTION 19 (iF AND WHERE DIRECTED) 2 unit |$ 1,000.00 | § 2,000.00 | $ 750.00 | $ 1,500.00 | $ 600.00 | $ 1,200.00 TEMPORARY CHAIN LINK FENCE, 4° HIGH 20 (IF AND WHERE DIRECTED) 500 LF 5 10.00 | $ 5,000.00 | $ 15.00 | $ 7,500.00 | $ 25.00 | § 12,500.00 CART PATH, 6.5" WIDE, 6.5" THICK (INCLUDING EXCAVATION, 24 EARTHWORK AND'GRADING) 20500 sy |$ 60.00} $ — 1,230,000.00] $ 70.00} $ — 1,435,000.00 | $ 65.00] $ — 1,332,500.00 TRIMMING EXISTING TREES, OVER 6” TO 12” DIAMETER (IF AND 22 WHERE DIRECTED) 1 unit | 8 500.00 | $ 500.00} $ 500.00 | $ 500.00} $ 546.00 | $ 546.00 TREE REMOVAL, OVER 4" TO 8” DIAMETER 23 (IF AND WHERE DIRECTED) 1 unit |S 500.00 | $ 500.00 | $ 500.00 | $ 500.00 | $ 432.00 | $ 432.00 ‘TREE REMOVAL, OVER 8" TO 12" DIAMETER 24 (iF AND WHERE DIRECTED) 1 unit | $ 500.00 | $ 500.00 | $ 750.00 | $ 750.00 | $ 548.00 | $ 546.00 ‘TREE REMOVAL, OVER 12" TO 16" DIAMETER 25 (IF AND WHERE DIRECTED) 1 unit |$ — 1,000.00] $ 1,000.00] $ 1,000.00} $ 1,000.00 | $ 948.00 | $ 948.00 TREE REMOVAL, OVER 16" TO 20" DIAMETER 26 (F AND WHERE DIRECTED) 1 unit | § 1,200.00 | $ 1,200.00] $ 1,500.00 | $ 1,500.00] $ 1,380.00 | $ 1,380.00 TREE REMOVAL, OVER 20” TO 24” DIAMETER 27 (F AND WHERE DIRECTED) 1 unit | $ 1,500.00 | $ 1,500.00] $ 2,000.00] $ 2,000.00] $ 1,667.00 | $ 1,667.00 TREE REMOVAL, OVER 24” TO 28" DIAMETER 28 (iF AND WHERE DIRECTED) 1 uNiT |$ — 2,000.00] $ 2,000.00] $ 2,500.00 | $ 2,500.00] $ 2,875.00 | $ 2,875.00 TREE REMOVAL, OVER 28" TO 32" DIAMETER 29 (fF AND WHERE DIRECTED) 1 unit | $ 3,000.00} $ 3,000.00} $ 4,000.00 | $ 4,000.00] $ 4,082.00 | $ 4,082.00 TREE REMOVAL, OVER 32” TO 36" DIAMETER 30 (IF AND WHERE DIRECTED) 1 unit |$ 3,500.00] $ 3,500.00] $ 4,800.00 | $ 4,500.00] $ 4,082.00 | $ 4,082.00 TOPSOIL SPREADING, TYPE A 3 (UF AND WHERE DIRECTED) 10000 sy $ 10.00 | $
32” TO 36" DIAMETER 30 (IF AND WHERE DIRECTED) 1 unit |$ 3,500.00] $ 3,500.00] $ 4,800.00 | $ 4,500.00] $ 4,082.00 | $ 4,082.00 TOPSOIL SPREADING, TYPE A 3 (UF AND WHERE DIRECTED) 10000 sy $ 10.00 | $ 100,000.00 | $ 5.00| $ 50,000.00 | $ 5.00] $ 50,000.00 FERTILIZING AND SEEDING, TYPE A 32 (iF AND WHERE DIRECTED) 10000 sy |s 1.00 | $ 10,000.00 | $ 1.50] $ 15,000.00 | $ 1.60 | $ 16,000.00 33 STRAW MULCHING (IF AND WHERE DIRECTED) 10000 sy 8 1.00 | $ 10,000.00 | $ 1.50| $ 15,000.00 | $ 1.50 | $ 15,000.00 34 CONTRACT ALLOWANCE 1 Ls._|$ 25,000.00] $ 25,000.00] $25,000.00 | $ 25,000.00[ § 25,000.00 | $ 25,000.00 TOTAL BASE BID AMOUNT $__1,825,300.00 $__1,791,250.00 $__1,861,242.00
File revisions (1)
- Sep 29, 2026
4868ee0148c63,629,547 bytes