Supporting Documentation · Apr 5, 2022
85-22 Attachement-1 Lakeside Ave.pdf
8efb6f1bbf6d8440c07f4696db73dd04042bb6b03f4ee6c02f7c9864333a9cc1Indexed text · page 1
Show all pagesMatrix New World Engineering, Land Surveying and Landscape Architecture, P.C. 26 Columbla Turnpike Florham Park NJ 07932 973.240,1800 Fax 973.240.1818 www.mnwe.com — wae MATRIXNEWORLD March 22, 2022 Engineering Progress Township of West Orange 66 Main Street West Orange, New Jersey 07052 Attention: John Gross Re: Proposal for ASTM Phase | Environmental Site Assessment Twin Towing Auto & Truck Repair 1 Lakeside Avenue Block 115 Lot 16.01 and 51 and Block 1302 Lot 1 Small Portion of Block 1302 Lot 1 is in City of Orange West Orange, New Jersey 07052 Matrix Proposal No. 22-0367 Dear Mr. Gross: At your request, Matrix New World Engineering, Land Surveying and Landscape Architecture, P.C. (Matrix) is pleased to provide the Township of West Orange (Client) this proposal for the performance of a Phase | Environmental Site Assessment (Phase | ESA) in accordance with the ASTM International E1527-13 Standard Practice for Environmental Site Assessments: Phase | Environmental Site Assessment Process (ASTM E1527-13) for the above-referenced property (Site). SITE BACKGROUND Matrix understands that the Twin Towing Property is being acquired by the Township of West Orange for future redevelopment in the Town's downtown corridor. This Site is approximately 0.6124 acres and consists of one square two-story structure and an asphalt paved parking lot. Please note that Block 115 Lot 51 is owned by the Township of West Orange and is currently being leased by Twin Towing. Based on New Jersey Department of Environmental Protection (NJDEP) Geoweb, mapped historic fill is present throughout the Site. Matrix further understands that this Phase | ESA is being performed in anticipation of a business transaction involving the Site property PROPOSED SCOPE OF SERVICES The purpose of the Phase | ESA is to identify Recognized Environmental Conditions (RECs) at the Site, as defined by the ASTM E1527-13 standard, which is expected to meet the requirements of the “All Appropriate Inquiry” (AAI) Final Rule (40 CFR §312). This proposal does not include costs to conduct sampling. The scope of services for this proposed Phase | ESA includes the following tasks: « Perform a Site and vicinity reconnaissance (limitations due to snow cover, pools of water, cover vegetation, storage, or debris, etc. will be noted in the report); « Provide a description of current Site operations; *
vicinity reconnaissance (limitations due to snow cover, pools of water, cover vegetation, storage, or debris, etc. will be noted in the report); « Provide a description of current Site operations; * Conduct a historical source review and provide a description of historical Site conditions; F:\2022122-0367 1 Lakeside Avenue - Twin Towing\Proposal\Phase | ESA_ Twin Towing.docx 1
File revisions (1)
- Sep 29, 2026
8efb6f1bbf6d525,049 bytes