Supporting Documentation · Apr 5, 2022
85-22 Attachement-1 Lakeside Ave.pdf
8efb6f1bbf6d8440c07f4696db73dd04042bb6b03f4ee6c02f7c9864333a9cc1Indexed text · page 4
Show all pagesMATRIXNEWORLD Engineering Progress property acquisition decisions. The ASTM Standard refers to these additional factors as “business environmental risks”, which are defined as “risks that can have a material environmental or environmentally-driven impact on the business associated with the current or planned use of a parce! of commercial real estate, not necessarily limited to those environmental issues required to be investigated in this practice.” : Typical business environmental risk considerations include, but are not limited to, the following: * Asbestos-containing building materials * Health and safety e Radon « Ecological resources « Lead-based paint e Endangered species » Lead in drinking water e Indoor air quality unrelated to releases « Wetlands of hazardous substances or petroleum e Regulatory compliance products into the environment © Cultural and historic resources ¢ Biological agents . Industrial hygiene * Mold Pursuant to the Client's request, no ASTM non-scope considerations are included in this proposal. REPORT An electronic DRAFT report will be issued for your review and comment. Upon receipt and consideration of your comments, the FINAL report will be issued upon your authorization. The FINAL report will be provided in electronic format via electronic mail, or via a cloud-based link if the file size is too large to e- mail. cOsT Charges for services and reimbursable expenses will be based on a lump sum basis. We propose a lump sum cost of $7,560 for the services outlined in the above scope of work. If Client requests changes to the scope of work described herein, or requests additional services, Matrix will prepare a Contract Amendment Request (CAR) for Client's acceptance prior to execution of the work, Each CAR will set forth an adjustment to the initial approved budget. This cost estimate assumes the following: « Access to the Site and all on-site structures will be coordinated by the Client or Client representative. Additional Site visits due to lack of access will incur additional costs; The Site visit (including travel time) can be conducted in one eight-hour days by one Matrix professional; The review of pertinent Site regulatory files or records can be completed within 8 hours. If additional costs are necessary to review the available files, a separate cost estimate will be provided. The ASTM £1527-13 standard
Site regulatory files or records can be completed within 8 hours. If additional costs are necessary to review the available files, a separate cost estimate will be provided. The ASTM £1527-13 standard identifies reasonably ascertainable sources as information that can be provided within’20 calendar days of receiving a written, telephone, or in- person request from the source at no more than a nominal cost intended to cover the source’s cost of retrieving and duplicating the information. File information included in this proposed assessment must be provided within the schedule outlined below. Failure to provide this information to Matrix could result in a determination that “all appropriate inquiries” is incomplete; © Should the schedule be revised, or project be put on “hold” by the Client, all costs incurred by Matrix up to the notification of change of schedule or “hold” status will be billed to the Client. Additional fees that Matrix may incur once the project has resumed will also be billed to the Client in addition fo the below-queted fee; F'N2022\22-0367 1 Lakeside Avenue - Twin Towing\ProposallPhase | ESA_Twin Towing.doox 4
File revisions (1)
- Sep 29, 2026
8efb6f1bbf6d525,049 bytes