1152-121 224456-3 10 9. Soil Erosion and Sediment Control. The Developer shall, at the Developer’s cost, arrange for the installation, inspection and approval by the HEPSCD of all soil erosion and sediment control devices. A copy of the approved soil erosion and sediment control plan(s) (the “HEPSCD Plans”) shall be kept on site at all times (and available for inspection by Township officials). 10. Construction Traffic and Site Access. Construction traffic shall be permitted to gain access to the site only through the construction access route specifically shown on the Plans. The construction access shall be maintained throughout the course of construction so as to provide safe, adequate, and appropriate emergency vehicular access to the construction site. The Developer shall arrange for and be responsible to pay for all costs of traffic control officers and vehicles as required under Township Ordinances. 11. Site Mobilization. Vehicles and manpower may access the site to commence the construction activities described in this Agreement. 12. Development Sequence. Except as otherwise approved by the Township Engineer and as otherwise required by governing permits, approvals or laws and regulations, the following sequence shall be observed by the Developer: Phase I Construct soil erosion and sediment control measures (“ESC Measures”) in accordance with the HEPSCD’s requirements and recommendations. A. Install stone anti-tracking pad and other ESC Measures including down slope perimeter hay bales and silt fence Phase II Concurrently A. Demolish the existing structures and remove required trees on the Property B. Clear and rough grade for new building site Phase III Concurrently

File revisions (1)