Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Apr 26, 2022

109-22 Developers Construction Agreement.pdf

Preserved file SHA-2563dbf836df8e22bb19624a936f10bb264af73f8568550707d0c2a8fddf1a142cc

Indexed text · page 16

Show all pages
Page 16

1152-121 224456-3 16 proper maintenance and installation of all soil erosion and sediment control measures, devices, appurtenances, etc., required under this Agreement. H. TRAFFIC CONTROL AND ROADWAY CLOSING: 1. With respect to traffic, the Developer shall prepare and adhere to an approved traffic control plan based upon the Manual on Traffic Control Devices, specifically the section on construction maintenance signs. The existing structural condition of roadways accessing the site shall be documented as outlined under Section D of this Agreement above, and the Developer shall be responsible for all repairs to the said roadways resulting from damage caused by the Developer’s construction activity. Repairs of all damaged pavement found to be the Developer’s responsibility shall be made prior to issuance of the Certificate of Occupancy. 2. The Developer agrees there shall be no parking of construction-related vehicles on or within any existing public right-of-way. The Developer and its subcontractors shall become familiar with and utilize all approved truck routes and follow weight limits of all access routes to the Project. 3. In the event of any road closures, the Developer further agrees to first seek the approval of the Township Engineer and Township Council. The Developer is also aware that appropriate detour traffic signs must be in place and there must also be prior notice to the Police Department, all emergency services, the Board of Education and the public at large. 4. Unless otherwise indicated, the Developer agrees to be responsible for the installation, maintenance, and removal of all traffic control signs and traffic safety devices until such time as all site construction is completed, and a Certificate of Occupancy has been issued. 5. The Developer hereby grants Title 39 permission (N.J.S.A. 40:39-1 et seq.) to the Township to permit the enforcement of traffic and motor vehicle regulations.

File revisions (1)