Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Apr 26, 2022

109-22 Developers Construction Agreement.pdf

Preserved file SHA-2563dbf836df8e22bb19624a936f10bb264af73f8568550707d0c2a8fddf1a142cc

Indexed text · page 19

Show all pages
Page 19

1152-121 224456-3 19 M. CONSTRUCTION INSPECTIONS AND SPECIFICATIONS: 1. The Developer agrees that all construction methods and materials shall comply with approved plans. 2. Construction inspection shall be performed under the supervision of the Township Engineer. The Developer agrees to request inspection by the Township Engineer a minimum of two (2) business days prior to beginning any of the following activities: (i) ESC Measures, (ii) preparation of road subgrade, (iii) curb and gutter (forms), (iv) curb and gutter (material placement), (v) road surface and paving, (vi) sidewalk (forms), (vii) sidewalks (material placement), (viii) storm drainage pipes and other drainage or flood control facilities (including detention), (ix) street and traffic control signs, (x) sanitary sewer trench compactor, (xi) water main trench compactor and services, (xii) landscaping, (xiii) traffic safety measures, (xiv) paving of parking areas and (xv) parking lot striping. 3. The Developer understands and agrees that failure to request inspection as set forth herein may result in uninspected Improvements being summarily rejected, removed and replaced, and not eligible for release or reduction of the Performance Guarantee. 4. The Developer understands and agrees that in addition to the above, random and periodic inspections of the Project are required to ensure compliance with this Agreement. The

File revisions (1)