Page 9

1152-121 224456-3 9 services for or with respect to the Project if the account falls below the minimum required amount, except if such municipal services impact public health and safety. 6. Pre-Construction Meeting. No later than seventy-two (72) hours prior to commencement of construction, a pre-construction meeting shall occur with the Township Engineer, the Township Construction Official, the Zoning Board Consulting Engineer, representatives of the Township Department of Public Works and the Hudson Essex Passaic Soil Conservation District (the “HEPSCD”), and the Developer and the Developer’s authorized representatives. The Developer agrees that arrangement of the said meeting shall be the responsibility of the Developer, and at the reasonable convenience of the Township Engineer. This meeting shall be arranged a minimum of one week prior to the date fixed for the said meeting. 7. Prior Notice to Commence Construction. Seventy-two (72) hours’ prior notice of intent to begin construction shall be given to the Township Engineer. Notice may be made by phone or email. 8. Documentation of Existing Public Improvements. The Developer shall retain a qualified individual who shall, prior to commencement of construction operations, prepare either a series of 3”x5”, 35mm, color photographs or a color video recording of the construction entrance and the proposed construction vehicle routing plan. The said documents shall be labeled, titled or narrated, time dated and in sufficient detail to document all physical features such as pavement, curbs, sidewalks, driveways, fences, lawns and other features which might be damaged during construction. The Developer shall notify the Township Engineer seventy-two (72) hours prior to preparing the said documents and shall provide the Township Engineer with two (2) copies of all documents produced.

File revisions (1)