Supporting Documentation · Apr 26, 2022
125-22 Attachment - Admin Procedures Appendices Final Revised March 2022.pdf
67f522fbe67a6517f161ff763a90217ae744e7aa5eec0936734382a47d5bec39Indexed text · page 17
Show all pagesthe CR-266 will not be accepted after its initial submission and prior to award of the Contract. (A statement that all forms can be downloaded from the site location above will be included in the Specifications and Bid Advertisement) • A completed and signed Verification of DBE/ESBE/SBE Firm (Form CR-273) for each firm listed on the CR-266 to demonstrate direct written confirmation from each DBE firm of willingness to participate on the Contract, confirming the kind and amount of work that was provided on the Contractor’s CR-266. This form must be completed in its entirety and signed by each DBE firm. • A completed and signed DBE/ESBE/SBE Regular Dealer/Supplier Verification (Form CR-272) for all Regular Dealers/Suppliers listed on the CR-266 form, if applicable. This form must be completed in its entirety and signed by each DBE firm. • A completed and signed DBE/ESBE/SBE Trucking Verification (Form CR-274) for all DBE trucking firms listed on the CR-266, if applicable. This form must be completed in its entirety and signed by each DBE firm. • Documented evidence of good faith efforts if the bidder’s commitment shown on the CR-266 fails to equal or exceed the contact DBE goal. Note - If the Department (NJDOT) determines that the apparent lowest responsive Bidder has failed to commit to meet the Contract DBE Goal and made adequate good faith efforts to do so, the Department (NJDOT) must, before awarding the Contract, provide the Bidder an opportunity for Administrative Reconsideration. The WEST ORANGE TOWN TOWNSHIP will start the process of Administrative Reconsideration. The ADMINISTRATIVE RECONSIDERATION will follow the process shown in the 2019 STANDARD SPECIFICATION SECTION 102.13.,01 BIDDERS PRE-AWARD REQUIREMENTS PART 3. Immediately after the five day Civil Rights document submittal period following the bid opening, West Orange will verify that all forms have been submitted and email to the Local Aid project manager as well as cc. DOT-CR.Verifications@dot.nj.gov the following: • The above noted
West Orange will verify that all forms have been submitted and email to the Local Aid project manager as well as cc. DOT-CR.Verifications@dot.nj.gov the following: • The above noted forms submitted by each bidder. • A list of all responsive bidders as determined by the West Orange’s Legal Department in the order of lowest bidder to highest bidder. The process for contractors who fail to meet the required contract goal can be found in Section 102.13.01 of the 2019 NJDOT Specifications. A request for an administrative reconsideration can be made as per Section 102.13.01 of the NJDOT 2019 Standard Specifications. Firms listed on the CR-266 will not be counted toward the Contract DBE goal unless completed and signed CR-273 form(s), and applicable CR-272 and CR-274 form(s) are submitted to the Township within the 5 days after bid opening. NJDOT Civil Rights will review the submitted forms and if the apparent lowest responsive bidder meets the Contract DBE goal, will issue an approval to the Local Aid Project Manager. West Orange will then be notified that they can proceed with the award of this project. Procedure for Administration and Inspection of Federal Aid Highway Projects Page 17
File revisions (1)
- Sep 29, 2026
67f522fbe67a1,554,006 bytes