Show all pagesAmerica Certification. All activities on the project are documented in the daily inspection reports using NJDOT Daily Inspectors Report Form (DC-29, DC-144 or approved equal) and an Item Summary Sheet. The inspections report are supplemented with field notes that includes measurements (length, width, depth, slope), calculations (area, volume, weights), sketches, a statement of compliance with the plans and specifications, any field changes, comments, delivery tickets that have to be received and initialed by the inspector before placement. The Resident Engineer will use the summary of pay items to develop the monthly payments and submit them for review to the RC/PM. The Resident Engineer will ensure that testing of materials is properly conducted and documented in the project file and referenced in the daily reports. The inspection reports are signed and dated by the Inspector and reviewed and initialed by the Resident Engineer. The item summary sheets are used to verify and negotiate the Contractor’s payment requests. The inspection team performs wage rate inspection using the required forms including Form DC- 126 and verify that the prevailing wage rate requirements of 23 U.S.C. and the Davis-Bacon Act are met. The inspection team will make sure that all the environmental commitments and/or permit requirements are met and all required Civil Rights notices are posted at a location visible at the project site. These will be documented in the daily inspection reports. The maintenance and traffic control plan impacting work zone and pedestrian safety must be reviewed by the resident engineer on a daily basis and be in compliance with the MUTCD and a request to the Contractor to correct or supplement accordingly. A record of this daily inspection must be included on the daily report. The inspection team shall ensure that all the pedestrian facilities constructed in accordance with Section 504 of Rehabilitation Act of 1973 and Title II of ADA Act of 1990 and in accordance with AASHTO standards and Americans with Disabilities Act, Accessibility Guidelines (ADAAG). The inspection team, under the RC/PM supervision, monitors and requests corrections from the Contractor as needed of: progress schedule, Contractor payments and contract completion to make sure full adherence to the approved schedule and specified contract time. The inspection team shall
the Contractor as needed of: progress schedule, Contractor payments and contract completion to make sure full adherence to the approved schedule and specified contract time. The inspection team shall monitor that the DBE/ESBE goals identified in the approved bid documents on the Form CR-266F-Schedule of DBE Participation for the project are met. The inspection team verifies and ensures that the work to be performed by DBE Sub-contractors is being performed by the previously approved DBE Firms listed on the Form CR-266F. The Resident Engineer will use the daily reports to document the on-site monitoring. Any changes to the DBE Goals or Contractors must be submitted to NJDOT on revised Form (CR-266) for approval. Section 108.01 of the NJDOT specifications must be followed. Procedure for Administration and Inspection of Federal Aid Highway Projects Page 23
File revisions (1)
- Sep 29, 2026
67f522fbe67a1,554,006 bytes