Show all pagesContract changes must be monitored and documented daily. The Contractor may not deviate from the requirements of the contract unless and until a field order is issued by Resident Engineer upon approval by the RC/PM and NJDOT Local Aid. Contract line item overruns are not permissible without formal requests by the Contractor and approvals by the RC/PM. All new or supplemental costs must be negotiated, itemized and justified. All documentation of the negotiations, including the basis of cost, must be on file and included in the change order request. The Resident Engineer will notify the RC/PM once it becomes apparent that a change to the Plans and/or Specifications is required. After reviewing the plans and/or Specifications to determine if the change is valid and necessary in conjunction with the consultant who designed the project the potential extra work is evaluated and recommended for approval. The RC/PM notifies the NJDOT- Local Aid Office once it has been established that a Change Order for changes in the contract quantity or extra work/new work is necessary and prepares a field order. The form shall state the description of the change or extra work (new work), reason for the change, value of the change (increases or decreases against the contract price). Time is also evaluated as part of the change order. This form will authorize the Contractor to proceed with the work upon written approval from NJDOT Local Aid. The Contractor should provide to the Resident Engineer a detailed cost proposal (materials, labor, equipment, overhead) for extra (new work). The cost will be reviewed by the Resident Engineer and the RC/PM, documented, and negotiated based on the cost estimate prepared by the Resident Engineer, under the supervision and approval of the RC/PM, for the extra work cost presented by the Contractor. The negotiated costs will be included in the change order. The change order will be signed by the Contractor, the Resident Engineer and submitted to the RC/PM for review. If the price for extra/new work cannot be mutually agreed upon, the Township of West Orange will initiate work by force account as per Section 104.03 of the Standard Specifications. The RC/PM prepares a Federal Aid Change Order (DC-173A) and submits it to NJDOT for their review and approval once the Municipal Council approves the change order. The Change Order will serve as a
s. The RC/PM prepares a Federal Aid Change Order (DC-173A) and submits it to NJDOT for their review and approval once the Municipal Council approves the change order. The Change Order will serve as a contract document adjusting the contract price. Any amounts in excess of the authorized contract amount cannot be expended until the Change Order is approved. Time should always be evaluated as part of a change order, because it will change the contract time and contract completion date, therefore any change order must include the required additional time for extra work. The RC/PM will notify NJDOT if during the course of construction, an inherent job condition should arise, and said condition, if not immediately corrected or changed, would unduly delay the Contractor. Upon the written authorization of the NJDOT, the Contractor will be instructed by field order and the Township of West Orange will proceed with the approval of the change order at the next available Municipal Council meeting. 6.9 Field Orders (Appendix E) The RC/PM will notify NJDOT Local Aid, if during the course of construction, an inherent job condition should arise, and said condition, if not immediately corrected or changed, would unduly delay the project completion. The Contractor will provide to the Resident Engineer and RC/PM Procedure for Administration and Inspection of Federal Aid Highway Projects Page 31
File revisions (1)
- Sep 29, 2026
67f522fbe67a1,554,006 bytes