Supporting Documentation · Apr 26, 2022
125-22 Attachment - Admin Procedures Appendices Final Revised March 2022.pdf
67f522fbe67a6517f161ff763a90217ae744e7aa5eec0936734382a47d5bec39Indexed text · page 55
Show all pagesWork item details: Local Public Agency: TOWNSHIP OF WEST ORANGE, NJ Project Location: XXX Section XXX From XXX to XXX (XXX) Federal Project Number: XXX Project Phases Included: Construction Engineering/Inspection Project Description: ******** ***Edit the Following as needed*** The TOWNSHIP OF WEST ORANGE's proposed work will begin XXX of XXX (Station XXX) and the XXX terminus of the project is XXX of XXX (Station XXX). The proposed highway improvement work will be in-kind within the existing right-of-way, and will consist of: 1. The roadway will be milled and resurfaced within the project limits and width of roadway pavement. (The existing concrete curb limits will be maintained throughout.) 2. The roadway centerline will be reprofiled to provide for an appropriate cross slope and centerline grade. 3. Traffic signage will be replaced and added throughout the entire length of the project, as applicable. 4. Traffic striping and markings will be placed on the new roadway pavement, as appropriate. Raised pavement markers will also be installed. 5. Drainage structures throughout the project will be upgraded, reconstructed or replaced, as applicable. 6. If needed, in kind replacement of existing curb. Estimated Construction Amount: $ XXX Funding: Federal Funding involved for100% Construction and Civil Engineering/Inspection ********* Term of Contract: Until project completion DBE goal: XX.X% Required NJDOT Cost Basis Approval: Construction Engineering and Inspection RFP Requirements Page 6
File revisions (1)
- Sep 29, 2026
67f522fbe67a1,554,006 bytes