SAMPLE TOWNSHIP OF WEST ORANGE CONTRACT the project work area. This DVD is to be a record of conditions before construction. When the contractor has finished recording the existing conditions, the RE is to immediately review this movie for content, and if found to be clear, properly done, and adequate, the RE shall immediately record the date of receipt and provide a copy to the TOWNSHIP OF WEST ORANGE Engineer’s Office before the construction begins. Shop Drawings - The RE shall record the date of receipt of all shop drawings delivered to the site and advise the Engineer and the contractor of the commencement of any work requiring a shop drawing if the submittal has not been approved by the Engineer. Review of Work, Rejection of Defective Work, Inspections and Tests -The RE shall conduct on- site inspection of the work in progress and shall assist the Engineer in determining if the work is in general proceeding in accordance with the plans and specifications. If the RE believes that any work is unsatisfactory, faulty or defective or does not conform to the plans or specifications, or has been damaged, or does not meet the requirements of any inspection, test or approval required to be made, the RE shall report this to the Engineer and shall further advise the Engineer of any work that the RE believes should be corrected or rejected or should be uncovered for inspection or requires special testing inspection or approval. The RE shall verify that tests, equipment and operating and maintenance are conducted in the presence of appropriate personnel and that the contractor maintains adequate records thereof. The RE shall report appropriate details relative to test procedures and results to the Engineer. Interpretation of Contract Documents - When clarifications and interpretations of the plans and specifications are requested by the contractor, the RE shall report this information to the Engineer and shall then transmit to the contractor the clarifications and interpretations as issued by the Engineer. Modifications to Plans and Specifications - Contractor’s suggestions for modifications to the plans or specifications shall be considered and evaluated by the RE and reported with the RE’s recommendations to the

Page 64

and Specifications - Contractor’s suggestions for modifications to the plans or specifications shall be considered and evaluated by the RE and reported with the RE’s recommendations to the Engineer. The RE shall then transmit the decisions issued by the Engineer to the contractor. Records - The RE shall maintain at the job site orderly files for correspondence, reports of job conferences, shop drawings, reproductions of original plans and specifications including all addenda, change orders, field orders, additional plans issued subsequent to the execution of the contract, Engineer’s clarifications and interpretations of the plans and specifications, progress reports, source documentation, buy America certifications, DBE compliance, and other project related documents. The RE shall keep a diary or log book, recording contractor hours on the job site, weather conditions, data relative to questions of field changes, change orders or other change conditions, list of job site visitors, daily activities, field decisions, observations in general and specific observations in more detail as in the case of observing test procedures. The RE shall send copies of the diary or field log to the Engineer and TOWNSHIP OF WEST ORANGE. The RE shall also record names, addresses, and telephone numbers of all contractors, subcontractors and major suppliers of materials and equipment. Reports - The RE shall furnish the Engineer and TOWNSHIP OF WEST ORANGE Engineer periodic reports as required of progress of the work and of contractor’s compliance with Page 7

File revisions (1)