Show all pagesSAMPLE TOWNSHIP OF WEST ORANGE CONTRACT the progress schedule and schedule of shop drawings. The RE shall advise the Engineer and TOWNSHIP OF WEST ORANGE Engineer in advance of scheduled major tests, inspections or start of important phases of the work. The RE shall draft proposed change orders and work changes, obtaining back-up material from the contractor and recommend to Engineer change orders, work changes and field orders. The RE shall report immediately to both the Engineer and TOWNSHIP OF WEST ORANGE upon the occurrence of any accident. Payment Requests - The RE shall review applications for payment with the contractor for compliance with the contract and shall forward the recommendations to the Engineer, Completion - Before the Engineer recommends a certificate of substantial completion to the TOWNSHIP OF WEST ORANGE Engineer, the RE shall submit to the contractor a list of observed items requiring completion or correction. The RE shall also conduct a final inspection in the company of the Engineer, TOWNSHIP OF WEST ORANGE and contractor and shall then prepare a final punch list of items to be completed or corrected. Prior to making recommendation for final payment to the Engineer, the RE shall assure that all items on the final punch list have been completed or corrected by the contractor. Communication and Emergencies - The RE shall have a cell phone in his or her possession at all times in case the TOWNSHIP OF WEST ORANGE Engineer requires any communication with the site. In addition, the RE shall supply the TOWNSHIP OF WEST ORANGE with a twenty-four hour phone number to be used in case of emergency. Emergencies include but are not limited to accidents involving property damage, bodily injury, hazardous waste spills or unearthing hazardous waste, or damage to existing utility infrastructure. As-Built Plans - The RE shall prepare a set of as built plans in accordance with requirements listed on page 3 Limitations of Authority of The RE: Shall not authorize any deviation from the contract plans or specifications or substitute any materials or equipment not authorized by the Engineer; Shall not exceed limitations of Engineer’s authority as set forth in the General Conditions or
substitute any materials or equipment not authorized by the Engineer; Shall not exceed limitations of Engineer’s authority as set forth in the General Conditions or the Contract; Shall not undertake any of the responsibilities of contractor, subcontractor or contractor’s superintendent; Shall not advise on, issue directions relative to or assume control of any aspect of the means, methods, techniques, sequences or procedures of construction without prior approval of the Engineer and TOWNSHIP OF WEST ORANGE Engineer Shall not advise on, issue directions regarding or assume control over safety precautious and safety programs in connection with the work; Shall not accept shop drawings from anyone other than the contractor; Page 8
File revisions (1)
- Sep 29, 2026
67f522fbe67a1,554,006 bytes