Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Apr 26, 2022

125-22 Attachment - Admin Procedures Appendices Final Revised March 2022.pdf

Preserved file SHA-25667f522fbe67a6517f161ff763a90217ae744e7aa5eec0936734382a47d5bec39

Indexed text · page 77

Show all pages
Page 77

TOWNSHIP OF WEST ORANGE Design Consultant Performance Evaluation Form Engineering Division STAFF & PERSONNEL(B) SCORE 1 Knowledge of Township standards, policies, and procedures: 2 Did Staff attempt to learn the Township standards, policies, and procedures: 3 Initiative in identifying important design or construction issues and developing alternative solutions: 4 Did staff make a recommendation when alternate solutions were to be developed: 5 In proposing alternatives, was sound engineering used in original design: 6 Were the most qualified staff used to develop plans: 7 Was the designated staff contact person completely knowledgeable and able to discuss plans and design or construction issues: 8 Extent Township staff was used to develop acceptable product: 9 Extent of personnel changes during life of contract: 10 How staff conduct itself in meetings and in the public: 11 Responsive and thorough in making revisions: COMMENTS: Total 0 Staff & Personnel (B) Score 0.00%

File revisions (1)