Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Apr 26, 2022

125-22 Attachment - Admin Procedures Appendices Final Revised March 2022.pdf

Preserved file SHA-25667f522fbe67a6517f161ff763a90217ae744e7aa5eec0936734382a47d5bec39

Indexed text · page 8

Show all pages
Page 8

Deliverables Design Communication Report Purpose and Need Statement Preliminary Preferred Alternative Environmental Document Classification Preliminary Engineering Phase Coordinate with Stakeholders, conduct environmental analysis for PPA, initiate roadway engineering, initiate structural engineering, initiate ROW and access, prepare final design and construction cost estimate, execute public involvement plan Deliverables Design communication report Preliminary engineering report Approved environmental document Approved design exception report Cost estimate – final design and construction Approved project plan Final Design Phase Complete roadway engineering, structural engineering, ROW, utility and access impacts, environmental process and prepare final design submission Deliverables Design communication report Environmental reevaluation and permits Acquisition of ROW Construction contract documents The construction support services tasks include, but are not limited to, the following: • Bidding process and award of contract • Attending pre-construction meeting • Shop, working drawings, submittals, reviews and approvals. *Note: The Design Consultant may be retained to perform construction support services during the construction phase. Procedure for Administration and Inspection of Federal Aid Highway Projects Page 8

File revisions (1)