Supporting Documentation · Apr 26, 2022
125-22 Attachment - Admin Procedures Appendices Final Revised March 2022.pdf
67f522fbe67a6517f161ff763a90217ae744e7aa5eec0936734382a47d5bec39Indexed text · page 82
Show all pagesv-18 CM/CI CONSULTANT PERFORMANCE EVALUATION FORM TOWNSHIP OF WEST ORANGE Consultant: CM/CI CONSULTANT. Quality Rater: Agreement: TBD Project: TBD Quality Reviewer: Rating Period: , Enter Enter "X" A. GENERAL weight 1-5 if N/A 1 Ability to work independently and be self directed 3 3 2 Communicates effectively with Contractor and Township personnel 3 3 Prepared for assignments (has appropriate plans, specifications and Standard Details 3 1 3 when performing inspections) 4 Reports promptly, is reliable and diligently performs duties 2 3 Familiar with Township Construction Procedures and executes assignments in 5 compliance with the Township 2 3 B. INSPECTION 6 Demonstrates technical knowledge of construction inspection 4 3 Familiar with assignment compliance requirements (standard specification/special 7 2 3 provision/ working drawing requirements) Inspects, monitors and coordinates the enforcement of traffic control/safety compliance 8 standards. In
provision/ working drawing requirements) Inspects, monitors and coordinates the enforcement of traffic control/safety compliance 8 standards. In addition, inspects, monitors and coordinates the enforcement of lane 3 3 restrictions/follows notification procedures for unanticipated lane closures/delays. Confirms contractor used only approved materials sources and verifies materials 9 certifications are received. 2 3 C. ADMINISTRATION 10 Staff completes Inspection Reports in an accurate and detailed manner. 3 3 11 Submits reports in a timely manner 2 3 12 Maintains office records (data entries/office filing/As-built plans) 1 3 13 Prepares and submits monthly payment Estimates 1 3 14 Compl. As-built quantity calcs. in accordance with Township Procedures as directed by RE. 1 x 15 Completes As-builts in a timely manner as directed by the RE. 1 x SUPER/VISOR/RE 16 Monitors the Contractor's progress schedule 1 3 17 Exercises oversight/ organizes inspection team to ensure all activities are monitored 3 3 18 Responds to RFI's/ Resolves field condition issues 3 3 19 Prepares Change Orders in accordance with the Contract in a timely manner 2 3 20 Responds to claims/ Ensures supporting documentation is recorded 2 3 21 Completes project closeout in a timely manner 2 x
Completes project closeout in a timely manner 2 x Overall Quality Rating 3.00
File revisions (1)
- Sep 29, 2026
67f522fbe67a1,554,006 bytes