Supporting Documentation · Apr 26, 2022
126-22 Exhibit.pdf
3207bc9766598303d2ec0541e1ec263c0399a5f10b3824ca893bbc03c110f8e2Indexed text · page 10
Show all pagesGC Scope: 1. Provide 2 concrete penetrations/holes needed through the floor and hallway wall. Steam Coils scope: 1. Fumish and install 2 steam coils for air handling units located at 2" floor. 2. Furnish and install steam valves and traps. 3. Modify steam piping as required. Electrical Scope: 1. | Wire all controls, end devices and new valve. Drawings Scope: 1. Provide mechanical and electrical “Record drawings” based on as-built conditions. Total Price for Scope of Work excluding applicable taxes: $168,000.00 Items also included: One (1) year warranty on all new controls Training 4 Hours Programming and onsite start up. Setup scheduling All exposed wiring is in EMT all wiring inside walls or above ceilings is in plenum code rated cable. ween Items not included: 1. Overtime labor 2. Any Balancing 3. Patching or Painting of walls 4, Boiler trim wiring 5. Cooling tower trim wiring 6. Trenching 7. DSL or cable services 8. Permits or inspections 9. Electrical permit fees 10, Starters, disconnects 11. Patching and or painting of floors, walls or ceilings 12, Smoke detectors 13. Air and water balancing 14. Any work not specifically mentioned or listed above Sincerely, Mohamed Abdelrahman Carrier Commercial Service Title Customer Acceptance (signature) Purchase Ordor Page 2 of 4
File revisions (1)
- Sep 29, 2026
3207bc9766591,341,570 bytes