Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Apr 26, 2022

126-22 Exhibit.pdf

Preserved file SHA-2563207bc9766598303d2ec0541e1ec263c0399a5f10b3824ca893bbc03c110f8e2

Indexed text · page 9

Show all pages
Page 9

Carrier Corporation Commercial Systems & Sales turn to the experts 27 www.commercial.carrier.com Quotation West Orange Municipal — 2"! Floor HVAC Job Name: System Upgrades Date; 4/18/2022 TOWNSHIP OF WEST ORANGE Customer: 66 Main St. West Orange Quote Number: 00668513 Attn: Lou Reynolds Project Narrative: Carrier proposes to convert a constant volume single zone air conditioning system into a multi-zone solution. The conversion requires scopes of work from all the major trades, including sheet metal, electrical, controls, steam fitting and general contracting. Please find the scope below by trade: DDC Controls Scope to operate new zoning scheme: 1. Furnish and Install Nema] panel including 120V (1) panel controls 2 AHU. 2. Furnish and install UCXP to control (2) AU Fan S/S 3 speed Fan CT Furnish steam valves Furnish SAT Furnish RAT Filter DP Damper actuator DX control i. Outside air temp (1) 3. Furnish (5) 8x14” VVT box with controllers 24V power for VVT Furnish space temp Furnish SAT Furnish RIB Relay to control EBB Heat Network to panel 4, Furnish (1) Bypass damper with controller j. 24V power k. EAT 1. Duct static tube m. Network to panel 5. Furnish 7” Touch screen with Graphics, set point, scheduling and alarming, Mounted on panel face. PaRmoeaoop Enhanced Zoning and Duct work modification scope: 1, Run new ductwork or adapting existing ductwork to accommodate zone dampers for the 6 ton air handler on the 2nd floor, There will be (5) zones total ~ (4) offices and (1) conference room. We will run new ductwork through the existing 2nd floor office and down the conference room. Conference room will have (3) new 2x2 diffusers installed. Supply and install (6) manual fire dampers with access doors. yRPYD

File revisions (1)