TOWNSHIP OF WEST ORANGE 25 LAKESIDE AVENUE, WEST ORANGE, N.J. 07052 DEPARTMENT OF PUBLIC WORKS ROBERT D. PARISI Tel: (973) 325-4160 Mayor Fax: (973) 669-9588 LEONARD R. LEPORE Director, Municipal Engineer Email: Engineering@westorange.org June 8, 2022 Mayor and Township Council Municipal Building 66 Main Street West Orange, New Jersey 07052 RE: MA-2020 Arverne Road, Crestmont Road (portion) and Westover Terrace (portion) CHANGE ORDER NO. 1 CIFELLI AND SON, GENERAL CONTRACTING Mayor Parisi, Council President McCartney and Council Members, The contract Street Improvements, MA-2020 Arverne Road, Crestmont Road (portion) and Westover Terrace (portion) Improvement Project with Cifelli and Son General Contracting of Nutley, NJ consists of hot mix asphalt pavement milling and resurfacing, curb replacement, driveway aprons, ADA accessible curb ramps and minor drainage improvements such as storm drain inlet retrofitting with the installation of curb pieces and bicycle safe grates for compliance with NJDEP stormwater management regulations. During the design process there was no indication that the existing sump pump drains were discharging directly and/or in close proximity to the roadway. Therefore, our office did not anticipate the need to include the construction of sump pump lines, underdrains, inlets and excavation associated with these items. In addition, the Asphalt Cement and Fuel Price Index has been escalating at a high percentage in a biweekly and monthly basis since the project was awarded on December 14, 2021. However, during curb construction operations, it was revealed that a substantial amount of existing sump pump drains and underdrains need to be constructed and connected to our existing storm sewers to prevent future ponding and add to the longevity of the roadways. In our experience when sump pump lines discharge to the street there is usually a visual indicator at the curb line or edge of the roadway. As a result, this work is being considered an unforeseen change order. The original contract amount was $873,652.41. I estimated that it will cost an additional $159,266.83 to account for the required drainage improvements and Asphalt Cement and Fuel Price index using current prices. I recommend an additional $159,266.83 be authorized as Change Order No. 1 to reflect the supplemental items needed in the contract for drainage improvements as well as
rice index using current prices. I recommend an additional $159,266.83 be authorized as Change Order No. 1 to reflect the supplemental items needed in the contract for drainage improvements as well as the increase associated with the asphalt cement and fuel price index. This Change Order brings the contract amount to $1,032,919.24. Attached, please find Change Order No. 1 with Cifelli and Son, General Contracting in the amount of $159,266.83 along with a Resolution authorizing the same including a list of the supplemental items for drainage improvements and fuel and asphalt price adjustment calculations supporting the request. When the project is completed later this month; there will be a detail account of all as-built quantities. If you have any questions, please contact me. Very truly yours, _xÉÇtÜw eA _xÑÉÜx Leonard R. Lepore, Municipal Engineer Director of Public Works LRL/zyc Cc: John Gross Ken Kayser Cifelli & Son
SUPPLEMENTAL ITEMS DATE: June 8, 2022 $873,652.41 ITEM NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT 74s 3 UNIT $3,000.00 $9,000.00 75s 100% LS $7,128.00 $7,128.00 76s 264 LF $45.00 $11,880.00 77s 1 LS $50,666.00 $50,666.00 78s 1 LS $9,200.00 $9,200.00 79s 100% L.S. $7,675.00 $7,675.00 80s 3 UNIT $2,565.00 $7,695.00 81s 50.11 TONS $28.00 $1,403.08 $104,647.08 CIFELLI & SON GENERAL CONTRACTING, INC. 81 FRANKLIN AVENUE NUTLEY, NJ 07110 2020 ROAD IMPROVEMENTS PROJECT ARVERNE ROAD, CRESTMONT ROAD AND WESTOVER TERRACE Date Awarded: 12/14/2021 Contract Amount SUB-TOTAL AMOUNT Inlet, Type B, Precast Rock Excavation, Storm Sewer 4 Inch PVC Schedule 40 Sump Pump Line 6" Perforated Drainwith Clean Stone, Cleanout Box and Connections 98 Arverne Road to Dead End, 400 LF, 9 Arverne Road to 17 Arverne Road, 15 Arverne Road Drain w/ Rip Rap 98 Arverne Road CONTRACTOR: Rock Excavation, Sanitary Sewer Type B Inlet Reconstruct with Driveway Access Plate 3/4" Clean Stone Underneath and Behind Curb
TOWNSHIP OF WEST ORANGE 25 Lakeside Avenue, West Orange, New Jersey 07052 DEPARTMENT OF PUBLIC WORKS Engineering Division ROBERT PARISI MAYOR LEONARD R. LEPORE Tel: (973) 325-4160 Municipal Engineer Director of Public Works Fax: (973) 669-9588 Email: Engineering@westorange.org AN EQUAL OPPORTUNITY EMPLOYER www.westorange.org [FILENAME:ma 2020 fuel price adjustment for resolution] Page | 1 ZYC 06/06/2022‐CALCULATIONS FUEL PRICE ADJUSTMENT CALCULATION FOR ARVERNE ROAD, CRESTMONT ROAD & WESTOVER TERRACE Asphalt Index: MF = $ 5.46 – PRICE DURING INSTALLATION (JUNE 2022) T = 1,742 TON (HMA 12.5M64)– BASED ON CONTRACT AMOUNT T = 0 TON (HMA 19M64) Ttotal= 1,742 TON HMA MILLING, 3” OR LESS = 13,168 SY– BASED ON CONTRACT AMOUNT BF = $ 3.30 – BID OPENING IN NOVEMBER 2021, (OCTOBER 2021 PRICE) HMA SURFACE COURSE= 1,742 TON * 2.5 GAL/TON = 4355 GAL HMA MILLING, UNCLASSIFIED DEPTH= 13,168 SY * 0.25 GAL/SY= 3292 GAL 7647 GAL EQUATION USED: F = (MF ‐BF) x G WHERE: F= FUEL PRICE ADJUSTMENT (FPA) MF= MONTHLY FPA BF = BASIC FPA G= GALLONS OF FUEL FOR PRICE ADJUSTMENT F = (MF‐BF) x G F= ($5.46‐$3.30) x (7647 GAL) = $16,517.52
TOWNSHIP OF WEST ORANGE 25 Lakeside Avenue, West Orange, New Jersey 07052 DEPARTMENT OF PUBLIC WORKS Engineering Division ROBERT PARISI MAYOR LEONARD R. LEPORE Tel: (973) 325-4160 Municipal Engineer Director of Public Works Fax: (973) 669-9588 Email: Engineering@westorange.org AN EQUAL OPPORTUNITY EMPLOYER www.westorange.org [FILENAME:ma 2020 asphalt price adjustment for resolution] ZYC 06/06/2022-CALCULATIONS Page | 1 ASPHALT PRICE ADJUSTMENT CALCULATION FOR ARVERNE ROAD, CRESTMONT RD & WESTOVER TERRACE Asphalt Index: MA = $ 750.00 – PRICE DURING INSTALLATION (JUNE 2022) T = 1,742 TON (HMA 12.5M64) – BASED ON CONTRACT AMOUNT T = 0 TON (HMA 19M64) Ttotal= 2000 TON BA = $ 513.00 – BID OPENING IN November 2021, (October 2021 PRICE) % BINDER = 5.00% EQUATION USED: A = (MA ‐BA) x T WHERE: A= ASPHALT PRICE ADJUSTMENT (API) MA= MONTHLY API BA = BASIC API T= TONS OF NEW BINDER A = (MA‐BA) x T A= ($750‐$513) x (1,742 TON * 5.00%) = $20,642.70
File revisions (1)
- Sep 29, 2026
6c29f112905e252,563 bytes