Supporting Documentation · Sep 20, 2022
242-22 Attachment - PSS Proposal Ginny Duenkel Pool Underwater Lighting Improvements.pdf
651552652ee27f3b68d1fda7bd187db3271214c1412f205a9523112e96575305Indexed text · page 1
Show all pagesfee Education Energy Utility Healthcare Public Works Real Estate Science & Technology 3 Mountainview Road PO Box 4039 Warren, NJ 07059 t. 732.560.9700 www.psands.com Via Email September 13, 2022 09022. 1429 Rev-1 Mr. Leonard R. Lepore, Municipal Engineer Municipal Engineer/Director of Public Works Township of West Orange 25 Lakeside Avenue ‘West Orange, New Jersey 07052 Re: Ginny Duenkel Pool - Main Pool Underwater Lighting Improvements PS&S Proposal for Engineering Services Dear Mr. Lepore: Paulus, Sokolowski and Sartor, LLC (PS&S) is pleased to submit this proposal to provide professional engineering services to the Township of West Orange for design, construction documentation, bid review, and construction administration services for the main pool underwater lighting improvements to the West Orange Ginny Duenkel Township pool. We understand the main pool has a footprint of approximately 9,500 square feet. An adjacent wading pool covers approximately 1,600 square feet but is not subject of this proposal. 1.0 SCOPE OF SERVICES Tn accordance with recent correspondence, we understand that the Township desires to have certain improvements made to the Ginny Duenkel Main pool. These improvements include new underwater lights of the Main Pool and the replacement of two existing electrical panels in the existing Electrical Room. PS&S proposes to provide the following professional engineering services in support of this project: A. Review of pool record construction plans and schematic plans and equipment catalog cut sheets. B. Perform a field visit to confirm/verify existing conditions at the site. C. Design and specifications for the installation of fifteen new underwater lights of the Main Pool, and replacement of two existing electrical panels in the existing Electrical Room. D. Provide twelve (12) sets of bid documents. E. Provide construction administration services including review and processing of contractor submittals (shop drawings, samples, etc.), response to RFI’s, and contractor payment requisition submissions. PS&S assumes a total of up to one (1) site visit during the entire construction period anticipated to be one month. 2.0 ASSUMPTIONS AND EXCLUSIONS We assume the following in our proposal: 1. Structural repairs/modifications to the pool are not anticipated/included, with the exception of work associated with the new
2.0 ASSUMPTIONS AND EXCLUSIONS We assume the following in our proposal: 1. Structural repairs/modifications to the pool are not anticipated/included, with the exception of work associated with the new underwater lights.
File revisions (1)
- Sep 29, 2026
651552652ee23,680,287 bytes