Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Sep 20, 2022

242-22 Attachment - PSS Proposal Ginny Duenkel Pool Underwater Lighting Improvements.pdf

Preserved file SHA-256651552652ee27f3b68d1fda7bd187db3271214c1412f205a9523112e96575305

Indexed text · page 2

Show all pages
Page 2

erwater Lighting Improvem 2. The design/technical specifications are anticipated to be on the drawings, and that book specifications are not required. 3. All Application and Permit fees will be paid by Township of West Orange. 4. Full time or daily site visits during construction period is not required and not included in the proposal. 3.0 SCHEDULE PS&S will commence work within five (5) days of authorization to proceed and estimates up to two (2) weeks to complete the design, specifications, and bid documents. The bid document review time by the Township of West Orange DPW is not included in the Schedule. 4.0 FEE, TERMS, AND CONDITIONS PS&S proposes to provide the aforementioned Scope of Services for a LUMP SUM fee of Eleven Thousand Eight Hundred Dollars ($11,800.00) as broken down below. These fees exclude any permit fees, which will be paid directly by the Township of West Orange. These services would be performed in accordance with the terms and conditions of the attached PS&S Schedule of Charges & Hourly Rates and General Conditions of Service both dated February 1, 2022. Fee Breakdown Phase 010 — Design $8,100.00 Phase 020 — Construction Administration $2,700.00 Phase 990 — Expenses (printing, mail, mileage) | _$1,000.00 Total | $11,800.00 5.0 AUTHORIZATION We appreciate the opportunity to prepare this proposal, and we look forward to working with you on this project. Should you find this proposal to be acceptable, please return a signed copy for our files. Very truly yours, PAULUS SOKOLOWSKI and SARTOR, LLC Ahi. Michael P. Cohen, PE, PMP Sr. Vice President ce: F, Chen (PS&S), T. Conlon (PS&S)

File revisions (1)