SECTION 1 Scope of Services / Fee Proposal Greenman-Pedersen, Inc. (GPI) understands that the Township of West Orange requires professional services for the Municipal Stormwater Management Plan for Permit Compliance. Throughout the firm’s 56-year history, we have provided professional services to dozens of New Jersey municipalities. We are very experienced in providing professional stormwater management solutions to our municipal clients that conform with the requirements of the New Jersey Department of Environmental Protection Municipal Stormwater Regulation Program on a cost-effective and timely manner. The following is a copy of the County's Scope of Services with enhancements and additions noted in blue text. 1. Municipal Stormwater Management Plan (MSWMP) The Township is required to update their existing 2005 MSWMP including tables, figures and appendices to the report. In addition, a complete the buildout analysis using Township's inventory of total land area sorted by HUC14 and land use zone will need to be tabulated using available GIS data. The existing impervious areas, wetlands areas and waterbodies will need to be subtracted out of the total land area to calculate the developable area. The Township's allowable impervious coverage in each zone will need to be applied to indicate a theoretical build-out of impervious land. Also, an additional calculation will be provided by zoning type to compute anticipated pollutant loads of Total Phosphorus, Total Nitrogen and Total Suspended Solids Loads from the buildout data using load criteria published by NJDEP (Ibs/acre/yr). Using the 2005 MSWMP as the base document, GP! will update the Township MSWMP and buildout analysis as indicated in the RFP. It is assumed the existing Township GIS data will be made available to GP! in a suitable GIS geodatabase format. 2 Catch Basin Inspection, Maintenance and Mapping The Township estimates that approximately 2,000 catch basins will need to be located and inspected throughout the municipality including inspection documentation for cleaning, clearing and repairs of structures as inspections progress in order for the Township’s DPW to schedule and make the necessary cleaning/clearing and repairs. The data collection will include: ¢ GPS data on all catch basins that can be field-located based on existing as-built drawings of the stormwater system. Catch basins

Page 4

ry cleaning/clearing and repairs. The data collection will include: ¢ GPS data on all catch basins that can be field-located based on existing as-built drawings of the stormwater system. Catch basins identified on any as-built drawings which cannot be field verified will be marked as such; any additional catch basins found in the field which are not in the as-built drawings will be added to the database. e GPS data on all catch basins that can be field-located. e Aphotograph of each catch basin. The graphical basis for this analysis will be the base map compiled from existing as-built plans, and other sources to build a useful and supportive base map for the Township's catch basins mapping. The data collected for mapping will need to in the ESRI GIS environment on NJ State Plane coordinate system required by the NJDEP. This base map will be used as a starting point for field data collection, and it is expected to be uploaded on mobile devices to record future data and supporting documentation to log in the number of wet tons of material collected. Township to provide personnel to assist with access and location of stormwater facilities. GPI will locate approximately 2,000 catch basins using GPS/GIS, in compliance with the NIDEP GPS Data Collection Standards for GIS Data Development. At same time, GPI will inspect the structures as indicated above. This proposal assumes GPI will be provided the Township's as-built drawings of the stormwater system to perform this task and that the Township will provide personnel to assist with access and locations of stormwater facilities. GPI Scope of Services/Fee Proposal | Page 2

File revisions (1)