Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Oct 25, 2022

263-22 Proposal - GPI.pdf

Preserved file SHA-256bc4e3aeee9c8ac1dabc73db9174739db05641c00d11f08926748ace67b487875

Indexed text · page 6

Show all pages
Page 6

4. Outfall Pipe Stream Scouring Consultant is to conduct an investigation for stream scouring in conjunction with the outfall mapping and provide inspection reports to the Township in order to complete the Stormwater Pollution Prevention Plan (SPPP). Township to provide personnel to assist with access and location of stormwater facilities GPI will inspect each outfall and the surrounding area for localized scouring of the streambanks or bottom caused by the outfall. GPI will provide an inspection report for each location. Stormwater Facilities Maintenance (Municipally Owned and/or Operated) ‘The Township is required to prepare a written program of long-term cleaning, operation and maintenance of municipally owned and/or operated stormwater facilities for which the Township staff will compile the necessary information for the Consultant to review for meeting the requirements of the permit and assist the Township in developing maintenance logs using NJDEP’s sample templates to link to the Township's GIS system. GPI will review and prepare maintenance logs in accordance with permit requirements with a link to the Township's GIS system. Stormwater Facilities Maintenance (Privately Owned and/or Operated) The Township is required to prepare a written program of long-term cleaning, operation and maintenance of privately owned and/or operated stormwater facilities for which the Township staff will compile the necessary information for the Consultant to review for meeting the requirements of the permit and assist the Township in developing maintenance logs using NJDEP’s sample templates that can be provided to private entities and to link to the Township's GIS system. GPI will review and prepare maintenance logs in accordance with permit requirements with a link to the Township's GIS system. Total Maximum Daily Load (TMDL)/Impaired Waterway The Township is required to identify TMDL’s for the watercourses within the municipality to assess initially and then annually for stormwater related pollutants to assess and prioritize maintenance schedules and repairs in order to address sources of pollutants of the published TDM’s. Consultant will be required to review the published TMDLs for streams include Fecal Coliform and Phosphorus for lakes and prepared written recommendations to the Township relating to maintenance priorities to be incorporated into the SPPP

Page 6

the published TMDLs for streams include Fecal Coliform and Phosphorus for lakes and prepared written recommendations to the Township relating to maintenance priorities to be incorporated into the SPPP and MSWMP. GPI will review published TMDL's for the streams and prepare written recommendations for maintenance priorities to be incorporated into the SPPP and MSWMP. Deliverables For the scope of services delineated above the Township requires the following deliverables: Outfall Pipe Map in PDF GIS geodata containing catch basins and outfall data collected Inspection reports including data, photos and report TMDL written recommendations Municipal Stormwater Management Plan in PDF and Word format Consultant is to submit two (2) paper copies of the deliverables along with electronic version of all documents. GPI will provide the aforementioned deliverables. GPI Scope of Services/Fee Proposal | Page 4

File revisions (1)