Supporting Documentation · Oct 25, 2022
263-22 Proposal - GPI.pdf
bc4e3aeee9c8ac1dabc73db9174739db05641c00d11f08926748ace67b487875Indexed text · page 7
Show all pages9. Proposal Fees Our fee for the services outlined above are as follows: Item No. | Description Labor Expenses Total 1 Municipal Stormwater Management Plan (MSWMP) $7,300.00 $7,300.00 2 Catch Basin Inspection, Maintenance and Mapping $62,050.00 $62,050.00 3A Outfall Pipes Mapping - Part A $14,000.00 No $14,000.00 3B Outfall Pipes Mapping — Part B $8,700.00 $8,700.00 4 Outtall Pipe Stream Scouring! $2,200.00 EXPENSES $2,200.00 5 Stormwater Facilities Maintenance (Municipally Owned and/or Operated) $3,600.00 $3,600.00 6 Stormwater Facilities Maintenance (Privately Owned and/or Operated) $6,500.00 $6,500.00 if Total Maximum Daily Load (TMDL)/Impaired Waterway $4,700.00 $4,700.00 TOTAL: | $109,050.00 ' Scouring field assessments are performed concurrently with Task 3A HOURLY BILLING RATES As submitted in our Qualification package to the Township of West Orange on December 21, 2021, following are our municipal billing rates: PROFESSIONAL ENGINEER $ 165.00 SENIOR PROJECT MANAGER, ENGINEERING $ 150.00 SENIOR PROJECT MANAGER, LANDSCAPE ARCHITECTURE $ 145.00 SENIOR DESIGNER $ 120.00 DESIGNER $ 95.00 INSPECTOR $ 95.00 ENGINEERING TECHNICIAN $ 85.00 PROFESSIONAL LAND SURVEYOR $ 160.00 SENIOR PROJECT MANAGER, SURVEYING $ 145.00 PROJECT SURVEYOR $ 120.00 SURVEYING TECHNICIAN $ 80.00 PARTY CHIEF $ 95.00 INSTRUMENT PERSON $ 80.00 TECHNICAL TYPIST $ 60.00 GPI Scope of Services/Fee Proposal | Page 5
File revisions (1)
- Sep 29, 2026
bc4e3aeee9c83,969,014 bytes