Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Oct 25, 2022

272-22 Exhibit A-Thorguard.pdf

Preserved file SHA-256a87f270073778de81ada82b9429e354a7677a78864eb795d977cdf6184bc6a19

Indexed text · page 10

Show all pages
Page 10

requirements will not be sufficient to establish equivalence. Original manufacturer's brochures of the proposed unit are to be submitted with the proposal. All modifications made to the standard production unit described in the manufacturer's brochures must be certified by the manufacturer and submitted with the bid, or the bid will be deemed "non-responsive" and rejected without further review. Ifa bidder proposes equipment that varies from the equipment specified, the bidder must provide, deliver, and retrieve a demonstrator unit similar to the one proposed at no cost to the Township within thirty (30) days of the bid opening for an evaluation period of no less than five (5) business days. INTERPRETATIONS In order to be fair to all bidders, no oral interpretations will be given to any bidder as to the meaning of the specification documents or any part thereof. Every request for such a consideration shall be made in writing to the Township Purchasing Agent. Based upon such inquiry, the Township may choose to issue an Addendum in accordance with NJSA 40A:11-23. GENERAL This specification states the minimum requirements of the Township. All bids must be regular in every respect. Unauthorized conditions, limitations, or provisions shall be cause for rejection. The Township will consider as "irregular" or “non-responsive” any bid not prepared and submitted in accordance with the bid document and specification, or any bid lacking sufficient technical literature to enable the Township to make a reasonable determination of compliance to the specification. It shall be the bidder's responsibility to carefully examine each item of the specification. Failure to offer a completed bid or failure to respond to each section of the technical specification (COMPLY: YES NO) will cause the proposal to be rejected without review as "non-responsive". All variances, exceptions and/or deviations shall be fully described in the appropriate section. Deceit in responding to the specification will 4. LIGHTNING PREDICTION SYSTEM NO 1.1 Uses electrostatic atmospheric analysis for prediction 1.2 System also detects lightning strikes including distance and direction 1.3 Site specific storm data used for prediction and data retrained | < Ix be [> 14 Generates an emergency notification system 8

File revisions (1)