Supporting Documentation · Nov 22, 2022
293-22 Exhibit A.pdf
c2847bad2f18f74ad97b7b6a3518ad5e59b57c96356056f9099764d4c8711163Indexed text · page 35
Show all pages2.20.2 All reporting of recyclable materials shall conform to the requirements of the New Jersey Department of Environmental Protection as required under the terms of Recycling Tonnage Grant Applications submitted by the Township. At a minimum, such data must include: 2.20.2(a) The marketing date 2.20.2(b) The weight receipt number 2.20.2(c) The market’s name 2.20.2(d) The market’s address 2.20.2(e) The weight of the material sold 2.20.2(f) The range and average price received per ton for each recyclable during the year. 2.20.2(g) All data must be provided on the Operator’s letterhead and signed. 2.20.2(h) The prices paid to the Operator for each material by type on a per ton basis, or where sold in the aggregate, the aggregate price received per ton. 2.20.3 The Operator shall provide an annual report in either an excel or word format no later than March 1 for the prior year that provides an annual summary of all Class B and Class C materials received at the facility in cubic yards in order that the Township can accurately determine the Operator’s compliance with the Exempt Class B and Class C facility requirements. Said report shall include, at a minimum: 2.20.3(a) Total cubic yards of Class B material received during the calendar year. 2.20.3(b) Total cubic yards of Class B material shipped from the site in raw form during the calendar year. 2.20.3(c) Total cubic yards of Class B material that has been processed as either: - First grind - Second grind - Dyed or finished mulch 2.20.3(d) Class C material received at the facility. 2.20.3(e) Class C material removed after receipt from the facility. 2.21 CHANGES TO OPERATING PROCEDURES 2.21.1 Changes to the Operating Procedures or approved equipment shall first require the approval in writing of the Township of West Orange and the NJDEP. 2.21.2 All expenses and fees required to change the Operating Procedures and/or Equipment utilized at any part of the recycling facilities shall be paid for by the Operator. 2.21.3 The Operator shall reimburse the Township for all of the Township’s expenses incurred with regard to this Agreement and all operations within seven (7) days of receipt. 2.22 TERMINATION 2.22.1 West Orange may, in
hall reimburse the Township for all of the Township’s expenses incurred with regard to this Agreement and all operations within seven (7) days of receipt. 2.22 TERMINATION 2.22.1 West Orange may, in its sole discretion, upon seven (7) days written notice delivered via hand delivery, overnight service or telecopy transmission to the Operator, terminate or limit the services of the Operator for good cause, including, but not limited to, the following: 29
File revisions (1)
- Sep 29, 2026
c2847bad2f187,047,338 bytes