SECTION 3 Project Schedule GPI understands the Township’s goal to conduct the scope of services by Winter 2023. GPI will conduct the surveying, site investigations and engineering design by Winter 2023 . However, NJDEP TWA permit process has a 90 day review period after submission of the permit level design plans, specifications, engineering reports and Statements of Consent. Upon permit issuance GPI will prepare final plans and bid documents for submission to the Township. We anticipate work will proceed within two (2) weeks after the award of contract. We have assumed a November 15 2022 contract award, and have prepared the following Project Schedule. Project Schedule (Assumed Contract Award) September 2023 November 2022 December 2022 November 2023 February 2023 October 2023 January 2023 August 2023

Page 10

August 2023 March 2023 June 2023 April 2023 May 2023 July 2023 November 15, 2022 1 Initiate Project and Kick Off Boundrary Tie-in surveys and Existing 2 Condition Surveys 3 Engineering Design TWA Application, Eng Report & 4 Statement of Consent Endorsements 5 TWA submission &(90 Day) Review Period 6 Final Plans Spec, Estimate & Bid Documents 7 Deliverables 8 Project Schedule | Page 1

File revisions (1)