Leonard R. Lepore, P.E. October 20, 2022 Page 2 Scope of Services Crew will perform the following major activities and tasks for the proposed project: Land Surveying and Civil Engineering Services Conduct a property boundary and topographic survey of the Township property with the existing pump station (Block 166 Lot 59.01) and along the proposed pipeline route (Block 166 Lot 14.01, Block 166 Lot 59, and part of Block 166 Lot 14) to obtain the location of existing utilities and physical features, which will be used to develop base mapping for the preparation of Contract Plans. The location of all existing utilities will be based on field markout and/or mapping provided by respective utility companies. Horizontal control will be based on NAD1983 and vertical control will be NAVD88 and three benchmarks will be set for future use. Conduct a limited field visit to observe and document the readily identifiable existing conditions that may affect the pump station demolition work to be specified. This includes a limited asbestos survey. This Proposal does not include any asbestos abatement design. Crew will provide a separate proposal in the event that asbestos is found. Crew will rely on available records to determine the wet well dimensions and wall thickness and any other concealed work. Confined space entry is not included in this Proposal. Design the sanitary sewer. After the base mapping has been prepared, a preliminary alignment for the sewer will be established. A set of the base map drawings will be marked up to show this alignment and presented to the Township for acceptance. Once the preliminary alignment has been accepted, the design of the sewer will be finalized. Design the modifications of the existing collection system to decommission the existing pump station and connect to the collection system in Northfield Avenue. This will include demolition of the pump station and a gravity connection for Block 166 Lot 14 (Crew will coordinate with the property owner). The project will be designed to maintain sewer service throughout the construction period. Submit a preliminary opinion of the probable cost to construct the work recommended. This will be furnished prior to proceeding to final design and will be included in the permit applications described below. Prepare Contract Plans for the proposed work. We anticipate a total of 9 drawings will

Page 17

e furnished prior to proceeding to final design and will be included in the permit applications described below. Prepare Contract Plans for the proposed work. We anticipate a total of 9 drawings will be needed to show the extent and character of the work, including a site plan, sewer plans and profiles, demolition plan, miscellaneous details, and soil erosion control plan and details. Prepare Contract Specifications. Under this task, Crew will develop New Jersey Department of Transportation supplemental Technical Specifications for the project, prepare the necessary contractors’ Bid Proposal Form, and prepare the Special Conditions for the contract to be included with the Township’s Front-End Bid Specifications to constitute the Contract Specifications. The Contract Plans and Contract Specifications will constitute the Bid Documents for obtaining contractors’ bids. Crew will furnish 20 sets of Bid Documents to the Township, along with pdf and AutoCAD copies. Submit an updated opinion of the probable cost to construct the work recommended, designed, and specified. This will be furnished in conjunction with finalizing the Bid Documents for construction bids.

File revisions (1)