Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Nov 22, 2022

294-22 Korwell PS-Proposals.pdf

Preserved file SHA-2562111d174ced782eedd4426e7e4b1dfebe939116a77d8c4a3323b16fcbec092bf

Indexed text · page 19

Show all pages
Page 19

Leonard R. Lepore, P.E. October 20, 2022 Page 4 e Review and process Contractor's monthly requests for progress payments and furnish recommendations to the Township. We anticipate two payment requests. Evaluate and issue certificates for substantial and final completion, review and process Contractor's request for final payment, and furnish recommendation to the Township e Review and provide recommendations to the Township for any field modifications and issue appropriate Change Orders to Contractor when needed. e Coordinate and observe field testing of sanitary sewers performed by Contractor. e Prepare Record Drawings for the constructed improvements based on the daily field sketches prepared by the full-time construction observer and submit in electronic format compatible with AutoCAD. Project Schedule As previously noted, a TWA will be required from the NJDEP. Typical NJDEP review time for TWA approval is three to four months. Crew will dedicate sufficient resources to complete the services described herein so that the TWA permit application can be submitted to the NJDEP in early-March (provided the utility markouts are complete and surveying can take place during the winter). Including the review period for the NJDEP, the project should be ready for bidding in the summer of 2023. We anticipate that the Township will award the Contract for Engineering Services in mid- November. Owner Responsibilities In conjunction with the performance of the Professional Engineering Services by Crew described in this Proposal, the Township will arrange, provide, or perform the following: e Provide copies of current Tax Maps in areas where work is proposed. e Provide any available drawings of the pump station to be used for estimating the wet well volume and thickness of any concrete to be cut below grade. e Obtain permission from property owners for surveying beyond right-of-way limits. e Arrange for access to the site and sanitary and drainage infrastructure, including removal of any debris above or inside of structures. e Provide field markout of existing sanitary sewer infrastructure in the immediate area of the proposed work. Provide any available information on existing sewers, including size and depth in the vicinity of the proposed project. e Pay fees imposed by reviewing agencies. Crew will notify the Township of the amount of the fees and the

Page 19

rmation on existing sewers, including size and depth in the vicinity of the proposed project. e Pay fees imposed by reviewing agencies. Crew will notify the Township of the amount of the fees and the Township will provide checks made payable to the reviewing agencies. Crew will submit the checks to the reviewing agencies with the permit application documents prepared by Crew. e Provide Township's standard administrative “front end” specifications in Microsoft Word format.

File revisions (1)