Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Nov 22, 2022

294-22 Korwell PS-Proposals.pdf

Preserved file SHA-2562111d174ced782eedd4426e7e4b1dfebe939116a77d8c4a3323b16fcbec092bf

Indexed text · page 27

Show all pages
Page 27

SCE-P09989.021 October 27,2022 Scope of Services ds Land Surveying Services SCE will perform a Boundary & Topographic Survey of Lots 14, 14.01, 59.01, and 59 in the Township, including all utilities for decommissioning the pump station and to construct the proposed gravity sewer main. The following will be included: Coordination and preparation of temporary construction easements as necessary for the proposed gravity sewer main. Legal descriptions for temporary construction easements. Coordination and preparation of permanent sanitary sewer easements as necessary for the proposed gravity sewer main. Legal descriptions for permanent easements. Benchmark(s) (minimum of three (3)) to be set for future use. Existing conditions/Survey Control plan. Coordination of utility markouts with the Township. It is anticipated a full Boundary & Topographic Survey of Lot 14 is necessary and only the affected area in front of the lot identified below will be surveyed as part of this project. > 5 Proposed Sur ‘vey Limits

File revisions (1)