SCE-P09989.021 October 27,2022 until well into the processing and analytical portion of the survey. If substantial errors are discovered at this stage, the Township will be notified, and a course of action will need to be agreed upon prior to finalizing the finished product. Set Missing Corner Markers (NOT INCLUDED) When a survey is performed, all boundary or corner markers delineating the property surveyed, found or set, must be described on the plat of survey (N.J.A.C. 13:40-5.1). In accordance with N.J.A.C. 13:40-5.2, the “ultimate user” has the right to waive this service by signing the attached corner marker waiver form. By signing this document, the ultimate user understands that there may possibly be the need of a future survey as a result of physical improvements to the property and/or the potential inability of the ultimate user to identify the boundary of the property. It is anticipated the Township will execute a Corner Marker Waiver, and the setting of missing corner markers is specifically excluded from the scope herein. . Civil Engineering Services SCE will perform and provide the following services as part of this phase: = Design for decommissioning the existing pump house/station and replace with 8- inch diameter sanitary trunk sewer. * Prepare Treatment Works Application (TWA) application for permit to construct and operate the proposed sewer main. The decommissioning of the pump station will be included under this permit. * Design and prepare contract drawings for decommissioning the pump station and construction of new sanitary sewer main. * Prepare an application for the Hudson-Essex-Passaic Soil Conservation District (HEPSCD), as the project will result in a land disturbance of more than 5,000 square feet. = Coordinate with property Owner at Lot 14 for tying existing pressure line to propose gravity sewer main. » Plan Set to include but not limited to Cover Sheet, Existing Conditions/Survey Control Plan, Demolition Plan, Construction Plan, Grading and Utility Plan, Profiles, Soil Erosion and Sediment Control Plan and Details, and Construction Details. « Hold four (4) meetings with the Township Officials for Kickoff, Coordination with other parties involved as necessary, Preliminary Design, and Final Design. = Furnish Bid Package that includes bid set of plans and construction specifications in accordance with public bidding

Page 29

with other parties involved as necessary, Preliminary Design, and Final Design. = Furnish Bid Package that includes bid set of plans and construction specifications in accordance with public bidding laws. = Bidding documents (plans and specifications) will be part of the deliverables to the Township via AUtoCAD, hard copy, and PDF files. * SCEis prepared to advance two (2) soil borings to a depth of approximately 25- feet below grade to obtain the necessary sub-surface soil conditions.

File revisions (1)