Show all pagesSCE-P09989.021 October 27,2022 3. Construction Administration Services SCE is prepared to provide the following construction administration services for this project, if authorized by the Township: = Pre-construction kickoff meeting coordination. = Prepare pre-construction meeting agenda and chair meeting. Minutes will be prepared. = Review shop drawings. » Address request for information (RFI's). * Construction Stakeout. «Provide on-site construction observation during all critical phases of the work. « Advise Township on project progress. * Review all Contractor payment requests and make recommendations to Township for payment. = Provide for punch-list inspection of the work. = Final closeout of project. = Make recommendations to Township for acceptance of the work and certification of completion. * Full-Time Construction Observation - 400 Hours A full-time Senior Resident Observer will be onsite daily to assure Contractor compliance and quality assurance, such as the use of specified materials and their proper application, and make all appropriate observations and prepare documentation with respect to contract compliance. The observations made by the Senior Resident Observer, in addition to those made by the Project Engineer during his periodic inspections, will also be utilized during review of Contractor invoices. «Daily Inspection Reports SCE Senior Resident Observer will prepare and maintain daily inspection reports detailing the work and pay items performed. » Prepare Closeout Punchlist At the end of construction activities, SCE will prepare a punchlist of any remaining items to be constructed or restored. The punchlist will be maintained until the entire scope of the project and restoration has been completed to the satisfaction of the Owner and any authorities having jurisdiction. Reimbursable Exoenses Anticipated reimbursable expenses for this project are included in the total fee outlined below. Additional expenses will be billed on a time and material basis in accordance with
File revisions (1)
- Sep 29, 2026
2111d174ced710,954,806 bytes