Supporting Documentation · Nov 22, 2022
294-22 Korwell PS RFP.pdf
68ebeb7ee34f671dc41411ba4dc8d75bf700a222f35a1393aad00caa595cf254Indexed text · page 2
Show all pagesAN EQUAL OPPORTUNITY EMPLOYER www.westorange.org the propose gravity sewer main; D. Legal descriptions for temporary construction easements; E. Coordination and prepare of permanent sanitary sewer easements as necessary for the propose gravity sewer main; F. Legal descriptions for permanent easements; G. Benchmark(s) (min. of 3) to be set for future use; H. Existing conditions/Survey Control plan; I. Coordinate utility markouts; As part of the deliverables, an electronic AutoCAD file of the Boundary and Topographic Survey is to be provided to our Engineering Division. 2. Civil Engineering Services: A. Design for decommissioning the existing pump house/station and replace with 8- inch diameter sanitary trunk sewer; B. Prepare Treatment Works Application (TWA) application for permit to construct and operate the proposed sewer main and the decommissioning of the pump station is to be included under that permit; C. Design and prepare contract drawings for decommissioning the pump station and construction of new sanitary sewer main; D. Prepare an application for the Hudson-Essex-Passaic Soil Conservation District (HEPSCD) since the project will result in a land disturbance of more than 5,000 square feet; E. Coordination with property owner at Lot 14 for tying existing pressure line to propose gravity sewer main; F. Plan Set to include but not limited to Cover Sheet, Existing Conditions/Survey Control Plan, Demolition Plan, Construction Plan, Grading and Utility Plan, Profiles, Soil Erosion and Sediment Control Plan and Details, and Construction Details; G. Include four (4) meetings with the Township Officials for Kickoff, Coordination with other parties involved as necessary, Preliminary Design, and Final Design; H. Bid Package that includes bid set of plans and construction specifications in accordance with public bidding laws; I. Bidding documents (plans and specifications) are to be part of the deliverables to the Township via AutoCAD, hard copy and PDF files. 3. Construction Administration Services: Provide separate lump sum cost for construction administration services based on full-time inspection. Construction Plans and Tax Map for the proposed improvements are enclosed. The cost of services shall be for professional engineering and land surveying services for the complete scope of the work including labor and materials for providing deliverables such as
are enclosed. The cost of services shall be for professional engineering and land surveying services for the complete scope of the work including labor and materials for providing deliverables such as maps,
File revisions (1)
- Sep 29, 2026
68ebeb7ee34f133,463 bytes