SS evel CMe Leonard R. Lepore, Municipal Engineer November 28, 2022 Township of West Orange Our File No. 2022-299 RE: Valley Road - From Freeman St. to Kingsley St. Ashwood Terrace and William St. from Franklin Avenue to Main Street |. Curb ramps as necessary 2. Ashwood Terrace (entire length) and William Street from Franklin Avenue to Main Street. A. Curb and sidewalk repairs; . Pavement milling and pavement resurfacing . Pavement striping . New traffic signs as necessary . Shade trees as necessary ™m™moow . Drainage structures repairs with new frames, grates, curb pieces as necessary. Repair existing drainage structures as necessary G. New manhole castings, frames and covers as necessary. Repair existing manholes as necessary H. Curb ramps as necessary With this being said, we anticipate the following scope of services: PHASE | - SURVEYING AND BASE MAP PHASE Work in this phase will include preparation of base mapping for use in the design of the construction plans. Our survey work will include detailed field survey information of the included roadways including establishing 1 foot contours in NAVD 88 datum. The field survey will locate all existing visible surface features such as curb, sidewalk, trees, mailboxes, street signs, shrubs, pavement markings, utility poles, street lights, hedges, fences, landscaped areas, drainage leader connections and driveways within the street right-of-way. We will also provide location of utilities, as listed below, where necessary and items within the project limits and 10’ behind curbs. This information will be utilized as the base map for the project construction plans. Approximate property lines will be established utilizing located property markers and tax map information. While preparing the above referenced survey/base map and upon completion, the following tasks will be included: 1. The preparation of a base survey showing all existing improvements along the roadways within right-of-way with a 25-foot overlap and easement areas. 2. Location of all existing physical surface features such as curb, sidewalk, trees, mailboxes, street signs, shrubs, pavement markings, utility poles, street lights, hedges, fences, landscaped areas, drainage leader connections and driveways within the street right-of- way/easement will be provided. ‘S:West Orange\Proposals\22-11-28 Proposal for Road Rehabilitation of

Page 18

s, fences, landscaped areas, drainage leader connections and driveways within the street right-of- way/easement will be provided. ‘S:West Orange\Proposals\22-11-28 Proposal for Road Rehabilitation of Valley Road - From Freeman St. to Kingsley SL, Ashwood Terrace and William Street - From Franklin ‘Ave to Main Street docx /

File revisions (1)