Supporting Documentation · Jan 10, 2023
21-23 Attachment.pdf
14c92698ec56453b61ed38dbbcf7198f72fc9103d86d6599a841247290b06cf8Indexed text · page 25
Show all pagesDESIGN SERVICES A. Topographic Survey and Base Mapping GPI will provide a topographic field survey and base mapping suitable for the proposed improvements, which will include, but will not be limited to, the following items: 1. Establishment of centerline of existing street. 2. Topographic survey of all trees, shrubs, walls, driveways, walks, steps, and other existing features within the ROW and farther where necessary to the proposed improvements. 3. Right of way will be shown from available Township Tax Map information. B. Design and Bid Documents 1. Before commencing the design, we will meet with you to review the specific requirements. We will coordinate our efforts with your Department throughout the project. 2. We will prepare engineering plans at an anticipated scale of 1” = 20’ utilizing the base mapping prepared under Task A. 3. We will coordinate with PSEG and the Township for decorative street lights. Required information for light pole footings, conduit and junction boxes will be included in the plans and specifications for contractor installation. Light poles and fixtures will be provided and installed by PSEG, electric service and electrical design will be by PSEG. 4. All design criteria will comply with the current NJDOT and MUTCD specifications. 5. We will prepare a complete set of specifications. 6. A final Engineer’s Estimate of Construction will also be prepared. 7. Plans and specifications will meet CDBG requirements and we will submit to Essex County CDBG Program for review. 8. We will prepare and submit twenty (20) sets of Contract Documents for public bidding. ASSUMPTIONS 1. The curbed island at Kingsley Street will remain as is; no improvements to this structure is anticipated. 2. Existing brick paver crosswalks will remain as is, or, if needed, we will provide standard detail for replacement-in-kind. 3. At intersection of Valley and Freeman Street, roadway and ADA ramp improvements will be limited to northerly side of Freeman Street intersection. Similarly, at Ashwood Terrace and William Street, improvements will be limited to easterly side of Main Street.
e limited to northerly side of Freeman Street intersection. Similarly, at Ashwood Terrace and William Street, improvements will be limited to easterly side of Main Street. Scope of Services | Page 3
File revisions (1)
- Sep 29, 2026
14c92698ec5613,117,099 bytes