Show all pagesFEE SCHEDULE Our fee for the tasks outlined above is: Valley Road Ashwood Terrace & William Street (Freeman Street to Kingsley Street) (Franklin Avenue to Main Street) Survey $11,400.00 $10,800.00 Design $20,500.00 $13,000.00 Total Fee $31,900.00 $23,800.00 TOTAL COMBINED FEES: $55,700.00 FEE SCHEDULE – Construction Inspection & Certification of Completion The time required to perform construction inspection services is a function of established contract duration(s), contractor’s schedule, and the Township’s need for part-time or full-time inspection. We will provide construction inspection services to fit with the Township’s needs. The services will be provided on an hourly basis. Our fee for the above referenced services is as follows: Construction Inspection Services $ 95.00/hr. Construction Inspection Overtime Rate $142.50/hr. Construction Administration $150.00/hr. HOURLY BILLING RATES As submitted in our Qualification package to the Township of West Orange on December 21, 2021, following are our municipal billing rates: PROFESSIONAL ENGINEER $ 165.00 SENIOR PROJECT MANAGER, ENGINEERING $ 150.00 SENIOR PROJECT MANAGER, LANDSCAPE ARCHITECTURE $ 145.00 SENIOR DESIGNER $ 120.00 DESIGNER $ 95.00 INSPECTOR $ 95.00 ENGINEERING TECHNICIAN $ 85.00 PROFESSIONAL LAND SURVEYOR $ 160.00 SENIOR PROJECT MANAGER, SURVEYING
$ 85.00 PROFESSIONAL LAND SURVEYOR $ 160.00 SENIOR PROJECT MANAGER, SURVEYING $ 145.00 PROJECT SURVEYOR $ 120.00 SURVEYING TECHNICIAN $ 80.00 PARTY CHIEF $ 95.00 INSTRUMENT PERSON $ 80.00 TECHNICAL TYPIST $ 60.00 Scope of Services | Page 4
File revisions (1)
- Sep 29, 2026
14c92698ec5613,117,099 bytes