Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Feb 13, 2024

59-24 Proposal - Fire House No. 4.pdf

Preserved file SHA-2565b18980b6e251ebb5625a93f52aa1ad406323b0ec710ba565901bf42f93ad558

Indexed text · page 4

Show all pages
Page 4

October 9, 2023 Mr. Leonard R. Lepore, PE, Municipal Engineer Re: Proposal for West Orange Fire House #4 Page 4 CME proposes to conduct the HVE treatment technology at proposed monitoring well (MW-13). Total of four (4) HVE treatment applications will be conducted at the Site on a monthly basis using a mobile HVE treatment unit. Task 4: Reporting and Management LSRP Project Management/Coordination CME will provide effective project management services to complete the work proposed herein and will coordinate with the Township and their subcontractor(s), CME’s subcontractor(s), and the NJDEP, as necessary. CME’s assigned LSRP will oversee remedial activities at the Site, prepare/certify related reports, and submit the required Site Remediation Reform Act (SRRA) forms to the NJDEP. CME’s LSRP will also participate in project related meetings and conference calls, as directed by the Township. Remedial Investigation Report The investigations will be documented in a Remedial Investigation (RIR) prepared pursuant to N.J.A.C. 7:26E-3.13. The RIR will summarize the field activities, methods, results, findings, and conclusions of the investigations. The RIR will include laboratory reports, analytical summary tables, boring logs, and maps and plans to appropriately document the sample locations and results. Based on the findings of the Remedial Investigation, recommendations will be provided for additional investigation and/or remedial action, if warranted. Health and Safety Plan A site-specific Health and Safety Plan (HASP) will be prepared in accordance with applicable Occupational Safety and Health Administration (OSHA) regulations and industry health and safety standards. The HASP will specify the health and safety procedures to be followed during implementation of the field activities at the Site in order to protect on site personnel and the general public, respond to emergencies, comply with environmental regulations, and prevent pollution as a result of work operations. Quality Assurance Project Plan A site-specific Quality Assurance Project Plan (QAPP) for the proposed investigation activities will be prepared in accordance with the requirements at N.J.A.C. 7:26E-2.2 and NJDEP guidance documents. The QAPP will specify the quality assurance (QA) and quality control (QC) procedures to be implemented during the field activities at the Site.

File revisions (1)