Supporting Documentation · Feb 13, 2024
67-24 GPI - FULL SUBM LTPF FY 2023_Walker S. Valley Rooney 02-02-24.pdf
1009c488f8b3c8d5885965f6a000fabb2dbb91e05b2c3d260de38a2f6cc7d7c2Indexed text · page 10
Show all pagesPersonnel Assignments | Page 5 SECTION 2 Personnel Assignments For this project, GPI will perform the work in its entirety. No sub-consultants will be needed. All work will be done entirely within GPI’s Engineering and Surveying Departments. Michael E. Pirog, PE, Project Manager, will be responsible for the overall design, contract adherence, and overall project supervision. Mr. Pirog is quite familiar with the Township of West Orange, having worked on several other Township projects in recent years. He will be assisted by Engineering Department staff members Michael A. Wallo, PE, CME, Assistant Director of Engineering/Project Engineer and Lenin Cruz, Senior Designer. Quality Assurance-Quality Control (QAQC) will be performed by Andrew Cangiano, PE, CME, Director of Engineering – Morris Plains Office.
File revisions (1)
- Sep 29, 2026
1009c488f8b31,190,498 bytes