Supporting Documentation · Feb 27, 2024
75-24 Attachment - salt shed cover.pdf
d50b7f8fb8debef49ec975aa553b95240ba96cc1cf29b5e88f6d5d76efa20850Indexed text · page 4
Show all pages5.00 Contractor's Cost Proposal - Detail (L/E/M) ESCNJ State Approved Coop #65MCESCCPS Township of West Orange DPW Salt Shed Cover Replacement 24-049 124711.00 20/21-03IQC Master Contract #: JOC Work Order #: Owner PO #: Title: Re: January 22, 2024Date: Proposal Value: Contractor: Murray Paving and Concrete LLC $102,208.31 (Excludes)Equip. MaterialLabor Line TotalDescriptionUOMMod.ItemSect. Section - 01 - General Requirements 01 22 20 00 0050 Project Manager1 $3,104.00HR Installation =x x 3,104.00 FactorUnit PriceQuantity Total 200.00 0.970016.00 MATERIAL PROCUREMENT, DELIVERY COORDINATIONS, SCHEDULING, STAGING, PROJECT CLOSEOUT, PUNCHLIST $3,104.00Subtotal for Section - 01 - General Requirements Section - 10 - Specialties 10 00 00 00 0025 Township of West Orange - DPW - Salt Shed Canopy Replacement2 $99,104.31EA Installation =x x 99,104.31 FactorUnit PriceQuantity Total NPP 99,104.31 1.00001.00 SEE ATTACHED QUPTE, SUBJECT TO NPP TERMS $99,104.31Subtotal for Section - 10 - Specialties Proposal Total This Proposal total represents the correct total for the proposal. Any discrepancy between line totals, sub-totals and the proposal total is due to rounding of the line totals and sub-totals. $102,208.31 The Percentage of NPP on this Proposal: 96.96% Page 1 of 1 1/22/2024 Contractor's Cost Proposal - Detail (L/E/M) Report
File revisions (1)
- Sep 29, 2026
d50b7f8fb8de462,036 bytes