Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Mar 12, 2024

86-24 Exhibit.pdf

Preserved file SHA-2562f296f542b2f190e5602edfbff3f3870e1d783af2262c3158793d80b76aa7305

Indexed text · page 3

Show all pages
Page 3

Township of West Orange February 9, 2024 Page Two 5. Furnish the labor, material and equipment required to install a one (1) new Duplex Pump Control panel on the pole adjacent to the pump station with the following: e Steel back panel and aluminum inner door e Incoming power block ¢ Main circuit breaker e IEC starters e Control transformer ¢ Control circuit fuse ¢ Hand-off-auto selector switches e Run lights e Seal fail lights and relays e Pump rail from overload and over-temp pilot lights e 22mm lights and switches ¢ Alarm test switch e Alarm light e Required control relays ¢ Terminal strip and ground lugs UL Listed labeled 698A Power on light Intrinsically safe relays Bulldog pump controller Furnish the labor, materials and equipment required to run conduit and wire from the Pump Control Panel to the Pump Station. Furnish the labor, materials and equipment required to form and pour concrete pad for new generator. Furnish the labor, materials and equipment required to install one (1) new 50kW Diesel Generator. Furnish the labor, materials and equipment required to install one (1) new 100amp Automatic Transfer Switch. Furnish the labor, materials and equipment required to make necessary electrical connections. Furnish the labor, material and equipment required to operate and test the station remove the temporary bypass pump and hoses set the parameters on the transducer and float elevations check alarms, operate multiple cycles on automatic.

File revisions (1)