Supporting Documentation · Mar 26, 2024
98-24 Exhibits to the Agreement for the Operation of the Recycling Center - Part IV.pdf
59592d9961d5d22edbf6d53df96d2871a898423d0182152c91107973a47e4c64Indexed text · page 14
Show all pagesCOUNTY CONSERVATION LLG 132201 REC210002 Recycling Center - Multiple Classes ~-Renewal Requirements Report Subject Item: RCBG915005 - Class B Recyclable Materials, Specific Requirements 66. 67. 68. 69. The total amount of unprocessed Class B recyclable material stored on-site shall not exceed 353,500 cy. If at any time, the amount of unprocessed Class B materia! stored on-site exceeds 353,500 cubic yards, the recycling center shall immediately cease receiving any unprocessed material until the amount of unprocessed Class B material stored on-site falls below 353,500 cubic yards. A fire lane of 25 feet shall be maintained between each unprocessed stockpile as indicated on the approved site plan drawings. [N.J.A.C. 7:26A- 3.5(e)] Unprocessed recyclable material shall not remain on-site, in its unprocessed form, for more than one (1) year. [N.I-A.C. 7:26A-3.9(0)] The total amount of processed trees, tree parts, stumps, brush and wood material (specifically non-chemically treated and unpainted) stored on-site shall not exceed 400,000 cubic yards (cy). [fat any time, the amount of processed trees, tree parts, stumps, brush and wood material (specifically non-chemically treated and unpainted) stored on-site exceeds 400,000 cy, the facility shall immediately cease receiving this material until the amount of processed material falls below 400,000 cy. The total amount of processed asphalt shingles stored on-site shall not exceed 30,000 cy. If at any time, the amount of processed asphalt shingles stored on-site exceeds 30,000 cy, the facility shall immediately cease receiving this material until the amount of processed material falls below 30,000 cy. The unprocessed and processed Class B materials shall be stored separately from one another. Processed materials stored on-site shall be stored only in those areas designated for that purpose as indicated on the approved site plan drawings. [N.J.A.C, 7:26A- 3.5(e)] - The total amount of processed Class B recyclable material stored on-site shall not exceed 430,000 cubic yards. Processed materials stored on-site shall be stored only in those areas designated for that purpose as indicated on the approved site plan drawing. If at any time, the amount of processed material stored on-site exceeds 430,000 cubic yards, the recycling center shall immediately cease processing activities until the amount of
site plan drawing. If at any time, the amount of processed material stored on-site exceeds 430,000 cubic yards, the recycling center shall immediately cease processing activities until the amount of processed Class B material falls below 430,000 cubic yards. A fire lane of 25 feet shall be maintained between each processed stockpile as indicated on the approved site plan drawings. [N.J.A.C. 7:26A- 3.5(e)] Subject Item: RCCG190747 - Class C Recyclable Materials, Specific Requirements 70. 71. The following organic materials may be received and processed in the compost areas designated on the approved site plans at this recycling center as authorized in this general approval: Leaves, Grass and Wood Chips. [N.J.A.C. 7:26A-3.5(e)1] The listed recyclable materials may be received in a commingled manner. Leaves may also be received commingled with brush, tree parts and/or tree stumps. [N.J.A.C. 7:26A-3.5(e)3] Pagel of 15
File revisions (1)
- Sep 29, 2026
59592d9961d517,388,115 bytes