Supporting Documentation · Mar 26, 2024
98-24 Exhibits to the Agreement for the Operation of the Recycling Center - Part IV.pdf
59592d9961d5d22edbf6d53df96d2871a898423d0182152c91107973a47e4c64Indexed text · page 16
Show all pagesCOUNTY CONSERVATION LLC 132201 REC210002 Recycling Center - Multiple Classes -Renewal Requirements Report Subject Item: RCCG190748 - Yard Trimmings General Requirements 79, 80. 84. If the incoming material contains grass, the material shall be accepted only in areas of the site that are at least 750 feet from any areas of human use or occupancy. Processing of such material shall begin on the same day of receipt. [N.J.A.C. 7:26A- 4.5(a)6,7] An update to the final closure plan as needed shal{ be submitted to the Department in writing at least 180 days prior to the proposed closure date for the recycling center. [N.J.A.C. 7:26A-4.5(a) 13] The recycling center shall notify the Department in writing at least 60 days prior to the proposed closure date for the recycling center. [N.J.A.C. 7:26A-4.5(a)9] The recycling center shall publish a notice of closure in a newspaper of general circulation in the district where the recycling center is located and in districts or communities sending at least 25 percent of their yard trimmings to the recycling center, Such notice shall be published at least 30 days prior to closure. [N.J.A.C, 7:26A-4.5(a)10] Within 30 days of ceasing operation, all residuals, unprocessed Class C recyclable material and recyclables shal] be removed from the site and recycled or disposed as appropriate and the recycling center shall arrange for a final cleaning of any containers, equipment, machines, floors and recycling center surfaces in which Class C recyclable materials or residue was processed or stored. [N.J.A.C. 7:26A-4,S(a)11] The Department shall determine that a recycling center is considered closed when all the requirements of the closure plan have been met. [N.J.A.C. 7:26A-4.5(a)12] Subject Item: RCCG190749 - Yard Trimmings Composting 85. 86. The recycling center operator shall attend a composting course sponsored by the Rutgers Cooperative Extension, the appropriate county agricultural or resource management agents or any other similar course recognized by the Department. Any operator hired subsequently shall attend a course within one year of being hired. [NJ.A.C. 7:26A-4.5(a)14i] Prior to windrow formation, dry yard trimmings shall be moistened to saturation without producing excessive runoff. [N.J.A.C, 7:26A-4.5(a) 14iii] To facilitate drainage and to reduce surface water ponding, each windrow shall be constructed
mmings shall be moistened to saturation without producing excessive runoff. [N.J.A.C, 7:26A-4.5(a) 14iii] To facilitate drainage and to reduce surface water ponding, each windrow shall be constructed and positioned in such a manner that it is perpendicular to the contours of the ground surface. [N.J.A‘C. 7:26A-4,5(a)14iv] A windsock shall be installed at the recycling center in order to indicate wind direction so that the recycling center operator may determine appropriate times for windrow turning operations. [N.L.A.C. 7:26A-4.5(a)14v] The recycling center shall follow the approved method of windrow composting defined in this general approval. [N.J.A.C. 7:26A-4.5(a)7, 14vi] Finished compost shall be tested once each year, at a minimum, in accordance with the monitoring and sampling plan established in this general approval. Results of all laboratory analysis for each parameter specified shall be recorded and maintained at the recycling center. N. TAL. 7:26A~-4.5(a) 1 4-viii] Page J-Il of FS
File revisions (1)
- Sep 29, 2026
59592d9961d517,388,115 bytes