Supporting Documentation · Mar 26, 2024
98-24 Exhibits to the Agreement for the Operation of the Recycling Center - 2024.pdf
fb768fc452710ff7fad5490bf74329f5bf237e34872cfb80af8cb6cfc87fcf8bIndexed text · page 200
Show all pagesNEW JERSEY SPORTS AND EXPOSITION AUTHORITY 132237 REC190002 Recycling Center - Multiple Classes -Renewal Requirements Report Subject Item: RCCG216219 - Class B and C Recycling Operations, General Requirements 61. 62, Pursuant to N.J.A.C. 7:26A-3.11(a), the holder of this general approval shall obtain prior approval from the Department for any increase in the design capacity of the facility. The facility shall submit a request to the Department, in writing, for the proposed increase and shall submit updated information pursuant to the requirements of N.J.A.C. 7:26A-3.2(a), 3.4, or 3.8, as applicable. The facility shall also provide written notice of the request to the solid waste or recycling coordinator of the applicable district. [N.J.A.C. 7:26A-3.5(e)] All processed material shall be stored separately from residues. [N.J.A.C. 7:26A-3 .5(e)] Subject Item: RCCG914256 - Class C Recyclable Material, Specific Requirements 63. 64, 65. 66. 67. 68. 69. 70. 71. 72. The recycling center may receive, store, process and transfer source separated leaves and grass clippings separately or in a commingled manner. [N.J.A.C. 7:26A-3.5(e)] Exclusive loads of grass clippings received shall be transferred on the same day of receipt to other recycling centers authorized to receive this material. Mixed loads of leaves and grass clippings shall be ground using the tub grinders by the end of the day of receipt and transferred within twenty four (24) hours of grinding to the other recycling centers authorized to receive this material. [N.J.A.C. 7:26A- 3.5(e)] Tf the incoming material contains grass, it shall be accepted only in areas of the site that are at least 1,000 feet from any areas of human use or occupancy, and processing of such material shall begin on the day of receipt. [N.J.A.C. 7:26A-4.5(a)6,7] The following source separated Class C recyclable materials may be received, stored, processed or transferred at this recycling center: Leaves and Grass Clippings. [N.J.A.C. 7:26A- 3.5(e)] Within 30 days of ceasing operation, all residuals and unprocessed Class C recyclable material shall be removed from the site and recycled or disposed, as appropriate, and the recycling center shall arrange for a final cleaning of any containers, equipment, machines, floors and recycling center surfaces in which Class C recyclable materials or residue was processed or
d the recycling center shall arrange for a final cleaning of any containers, equipment, machines, floors and recycling center surfaces in which Class C recyclable materials or residue was processed or stored. [N.J.A.C. 7:26A-4.5(a)11] Leaves and Grass Clippings shall be received only curing times when the recycling center operator or owner is present. [N.J.A.C. 7:26A-4.5(a)4] An update to the final closure plan as needed shall be submitted to the Department in writing at least 180 days prior to the proposed closure date for the recycling center. [N.J.A.C. 7:26A-4.5(a)13] The recycling center shall notify the Department in writing at least 60 days prior to the proposed closure date for the recycling center. [N.J.A.C. 7:26A-4.5(a)9] The recycling center shall publish a notice of closure in a newspaper of general circulation in the district where the recycling center is located and in districts or communities sending at least 25 percent of their yard trimmings to the recycling center. Such notice shall be published at least 30 days prior to closure. [N.J.A.C. 7:26-4.5(a)10] The Department shall determine that a recycling center is considered closed when all the requirements of the closure plan have been met. [N.J.A.C. 7:26A-4.5(a)12] Page [-8 of -10
File revisions (1)
- Sep 29, 2026
fb768fc4527148,516,431 bytes