Supporting Documentation · Mar 26, 2024
99-24 Exhibit to Temporary Extension Agreement.pdf
00d0dba76ba6d3d1d7a63a33656ba8a40ca72823740f177df05bad83d7b1ada0Indexed text · page 70
Show all pagesTRENCH. G3 EXISTING EXISTING BURY BOTTOM
BURY BOTTOM FLAP OF FABRIC FLAP OF FABRIC \ Z
GROUND GROUND AND TAMP AND TAMP ININ PLACE
PLACE any other ELEVATION ELEVATION
ELEVATION INSTALLATION DETAIL INSTALLATION DETAIL SEQUENCE OF CONSTRUCTION
OF CONSTRUCTION -_— by any —AN PROPOSED GABION BASKET SILT FENCE AT LIMIT MATERIALS
MATERIALS MATERIALS TIME TASK nor by oO \ I.
1. SILT FENCE SILT FENCE CLOTH: CLOTH: FILTER
FILTER X, POLY-FILTER X, X, POLY-FILTER MIRIFI 100X, X, MIRIFI 1
X, MIRIFI 1 OOX, LAUREL LAUREL 77 SEDIMENT CONTROL CLOTH,
File revisions (1)
- Sep 29, 2026
00d0dba76ba67,781,144 bytes