Supporting Documentation · Mar 26, 2024
99-24 Exhibit to Temporary Extension Agreement.pdf
00d0dba76ba6d3d1d7a63a33656ba8a40ca72823740f177df05bad83d7b1ada0Indexed text · page 70
Show all pagesEROSION CONTROL BIDIM OR CLOTH, BIDIM APPROVED EQUAL OR APPROVED (SUN
EQUAL (SUN a Rae Tre 72 HOURS PRIOR TO ANY SOIL RESISTANT)
EROSION project, nor ® BARRIER (SEE RESISTANT) other project, DETAIL) ~~ 2.
2. POST: 2" POST: OR "T" HARDWOOD OR
HARDWOOD OR 2" HARDWOOD OF "D" "T" OF STEEL (WEIGHING
TYPE STEEL "D" TYPE LESS NOT LESS
(WEIGHING NOT 2 DAYS INSTALL SILT FENCE AT PROPOSED GABION BASKET z SS Nak ape ’ THAN 1.33 POUNDS
THAN 1.33 POUNDS PER FOOT) LINEAR FOOT) PER LINEAR SEDIMENT BARRIER LOCATIONS
Q) | 3 WEEKS INSTALL GABION BASKET SEDIMENT BARRIERS AT INDICATED \o / STORMWATER DISCHARGE POINTS any other
© / | | | SILT
File revisions (1)
- Sep 29, 2026
00d0dba76ba67,781,144 bytes