Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Mar 26, 2024

99-24 Exhibit to Temporary Extension Agreement.pdf

Preserved file SHA-25600d0dba76ba6d3d1d7a63a33656ba8a40ca72823740f177df05bad83d7b1ada0

Indexed text · page 70

Show all pages
Page 70

EROSION CONTROL BIDIM OR CLOTH, BIDIM APPROVED EQUAL OR APPROVED (SUN

Page 70

EQUAL (SUN a Rae Tre 72 HOURS PRIOR TO ANY SOIL RESISTANT)

Page 70

EROSION project, nor ® BARRIER (SEE RESISTANT) other project, DETAIL) ~~ 2.

Page 70

2. POST: 2" POST: OR "T" HARDWOOD OR

Page 70

HARDWOOD OR 2" HARDWOOD OF "D" "T" OF STEEL (WEIGHING

Page 70

TYPE STEEL "D" TYPE LESS NOT LESS

Page 70

(WEIGHING NOT 2 DAYS INSTALL SILT FENCE AT PROPOSED GABION BASKET z SS Nak ape ’ THAN 1.33 POUNDS

Page 70

THAN 1.33 POUNDS PER FOOT) LINEAR FOOT) PER LINEAR SEDIMENT BARRIER LOCATIONS

Page 70

Q) | 3 WEEKS INSTALL GABION BASKET SEDIMENT BARRIERS AT INDICATED \o / STORMWATER DISCHARGE POINTS any other

Page 70

© / | | | SILT

File revisions (1)