Supporting Documentation · Mar 26, 2024
99-24 Exhibit to Temporary Extension Agreement.pdf
00d0dba76ba6d3d1d7a63a33656ba8a40ca72823740f177df05bad83d7b1ada0Indexed text · page 189
Show all pagesSite Improvement Site Improvement Description Description • Mill and Mill and repave repave approximately approximately 10,000 10,000 square square feet feet of of entrance entrance and and road road entering entering facility facility • Improve and Improve and maintain maintain plantings plantings at at entrance entrance to to the the facility facility • Pave areas Pave areas surrounding surrounding office office trailer trailer • Reconstruct and Reconstruct and enhance enhance class class A, A, 8 B &C &C residential residential drop-off drop-off area area • Add 12,500 Add 12,500 square square feet of pavement feet of pavement to to class class B B facility facility and
class B B facility facility and and construct construct retail retail bins bins in in a a neat neat and orderly and orderly manner manner (picture (picture attached) attached) • Regrade rest Regrade rest of of class class B B facility for vehicle facility for vehicle access access • Regrade and Regrade and clean clean up up berm berm on on east east side side of of the the facility facility and and plant plant ornamental ornamental grass grass on on the berm the berm to to screen screen facility facility from sensitive receptors from sensitive receptors • Have two Have two transfer transfer areas
lity facility from sensitive receptors from sensitive receptors • Have two Have two transfer transfer areas areas for class Band for class B and Class Class materials materials in in order order to to minimize minimize odor odor potential there potential there will will be be no no processing processing at at the the facility facility all all material material will will be be transferred transferred to to one one of Reliables of Reliables NJDEP NJDEP permitted permitted facilities. storage of facilities. storage of materials materials at at the the facility facility will
at the the facility facility will will be be a a maximum of maximum of 7500 7500 cubic cubic yards yards of of class class B B material material (Brush (Brush and and Tree Tree Parts) Parts) and and 5000 5000 cubic cubic yards of class yards of class C C (leaves) {leaves} material material Attached are illustrations Attached are site plan and aa site illustrations and the improvements of the plan of proposed. improvements proposed.
File revisions (1)
- Sep 29, 2026
00d0dba76ba67,781,144 bytes