Supporting Documentation · Mar 26, 2024
99-24 Exhibit to Temporary Extension Agreement.pdf
00d0dba76ba6d3d1d7a63a33656ba8a40ca72823740f177df05bad83d7b1ada0Indexed text · page 92
Show all pages“Site Improvement" "Site Improvement” shall shall mean mean those those physical physical improvements improvements to to the the Site Site that that enhance enhance the the aesthetic, operational aesthetic, operational and and compliance compliance factors. factors. 2.1 SCOPE 2.1 SCOPE OF OF WORK —~ OVERVIEW AND WORK-OVERVIEW AND SUMMARY SUMMARY 2.1.1 The 2.1.1 The object object ofof this this RFP RFP isis to to retain retain thethe services services ofof an an Operator Operator toto operate operate and and maintain maintain the the Township's Recycling Township's Recycling Convenience Convenience Center Center and and toto operate operate the the Township's
operate the the Township's Township's exempt exempt ClassClass B- B- Wood Wood andand the Township's exempt the Township's exempt Class Class C-Compost C-Compost facility. facility. The The successful successful Operator Operator shall shall also also maintain and maintain and operate operate the Recycling Convenience the Recycling Convenience Center Center in in accordance accordance with with the the terms terms of of this this RFP and shall RFP and shall submit submit a a proposal proposal for for the the marketing
proposal for for the the marketing marketing of of all all recyclable recyclable commodities commodities that that originate originate at at this facility. this facility. 2.1.2 The 2.1.2 The successful successful Respondent Respondent shall shall be be required required toto provide finished wood provide finished wood mulch, mulch, and and finished finished compost to compost to the Township at the Township at no no cost cost to to the the Township Township as as required required and and specified specified inin Section
and specified specified inin Section Section 2.12. 2.12.1 I and 2.12.2, and 2.12.2, and and shall shall also also be be required required toto provide finished wood provide finished wood mulch mulch and and compost compost at at no no cost cost to to the residents of West Orange (so long as the material is collected by said residents in their the residents of West Orange (so long as the material is collected by said residents in their private private vehicles) vehicles) asas required required and and specified specified in in Section Section 2.12.3. 2.12.3. 2.1.3 The successful 2.1.3 The successful Respondent Respondent shall shall provide provide for for thethe improvement improvement of of the
improvement of of the the Recycling Recycling Convenience Center Convenience Center inin accordance accordance with the physical with the physical site site plan plan improvements improvements and and landscaping landscaping improvement contained improvement contained within this RFP within this RFP atat aa level level equal equal toto or or better better than than that that outlined outlined within within this this RFP. Any such RFP. Any such improvements improvements shall shall bebe at at the the sole sole cost cost of of the the successful
cost of of the the successful successful Operator. Operator. No No improvements shall improvements shall be be undertaken without the undertaken without the express express written written approval approval of of the the Township. Township. The Facility 2.1.4 The 2.1.4 shall be Facility shall operated in be operated accordance with in accordance all terms with all and conditions terms and found within conditions found this within this RFP and shall be operated in accordance with the terms and conditions required under law. RFP and shall be operated in accordance with the terms and conditions required under law. 2.1.5 The Operator 2.1.5 The Operator isis advised advised that that any any fines fines assessed assessed byby any any governmental governmental agency
any governmental governmental agency agency including, including, but but not limited not limited toto any any violation violation ofof \aw law governing governing thisthis site site shall shall be be the the sole sole responsibility responsibility ofof the the Operator. This Operator. includes the This includes the possible possible costs associated with costs associated any fines, with any and possible fines, and of costs of possible costs meetings, additional inspections, hearings, legal expenses, attorney’s fees, written responses meetings, additional inspections, hearings, legal expenses, attorney's fees, written responses required or required or hearings hearings that
nses meetings, additional inspections, hearings, legal expenses, attorney's fees, written responses required or required or hearings hearings that that may may be associated with be associated with such such violation. violation. 2.2 SITE 2.2 SITE CONDITIONS CONDITIONS 2.2.1 The Operator 2.2.1 The Operator shall shall accept accept the the Facility Facility "As “As Is" Is” and shall be and shall be solely solely responsible responsible for for processing processing all existing materials that may be on the site as of the effective date of contract implementation. all existing materials that may be on the site as of the effective date of contract implementation. 2.2.2 The current 2.2.2 The current site site plan is shown plan is shown in in Appendix Appendix "A." “A.” 2.2.3 All operations 2.2.3 All operations must must be be performed performed by the Operator by the Operator within within the the site site limits
the site site limits limits described described herein herein and in and in Section Section 33 of of this RFP. this RFP. 2.2.4 Should the 2.2.4 Should the successful successful Respondent Respondent have have aa contract contract executed executed andand become become the the Operator Operator of of the the facility, and facility, and if if said said contract contract isis terminated terminated for for any any reason reason by by the the Operator Operator or or the the Township
or the the Township Township of of West Orange, all West Orange, all Class Class BB and and Class Class C C vegetative vegetative materials materials and and all all recyclable recyclable materials materials shall shall be be 19 19
File revisions (1)
- Sep 29, 2026
00d0dba76ba67,781,144 bytes